Regression analysis of initial geostress field in dam zone of Dagangshan hydropower station

被引:0
|
作者
Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061, China [1 ]
不详 [2 ]
机构
来源
Rock Soil Mech | 2009年 / 10卷 / 3071-3078期
关键词
Tectonics - Hydroelectric power - Slope stability - Hydroelectric power plants - Numerical analysis - Dams - Multivariant analysis;
D O I
暂无
中图分类号
学科分类号
摘要
In view of the influence of completely and intensively weathered stratum in the shallow surface of slope and fault fracture belt on the initial geostress field in dam zone of Dagangshan hydropower station, the 3D initial geostress regression analysis model is established based on the measured geostress data and geologic structure as well as topography features of V-shaped river valley. The optimal geostress regression coefficients have been achieved through 3D multivariate regression numerical analysis and the initial geostress field in dam zone of Dagangshan hydropower station is exactly simulated. The calculation results show that the initial geostress field in dam zone is a medium to high stress field composed of tectonic stress and dead-weight stress. The tectonic stress is prominent at shallow level and the dead-weight stress is prominent at deep level, which provides important reference basis for excavating simulation and long-term stability analysis of slope.
引用
收藏
相关论文
共 50 条
  • [1] Regression analysis of initial geostress field in dam zone of Dagangshan hydropower station
    Zhang Jian-guo
    Zhang Qiang-yong
    Yang Wen-dong
    Zhang Xin
    ROCK AND SOIL MECHANICS, 2009, 30 (10) : 3071 - 3078
  • [2] Three dimensional back analysis of geostress field in underground powerhouse zone of Dagangshan hydropower station
    Zhang Yong-hui
    Wei Qian
    Sheng Qian
    Leng Xian-lun
    Jing Feng
    ROCK AND SOIL MECHANICS, 2011, 32 (05) : 1523 - 1530
  • [3] Regression analysis of 3D initial geostress field for dam site of Xiaowan Hydropower Station
    Gu Yan-chang
    Zheng Dong-jian
    Guo Hang-zhong
    He Xian-feng
    ROCK AND SOIL MECHANICS, 2008, 29 (04) : 1015 - +
  • [4] Back analysis of initial geostress field for underground powerhouse zone of Shuangjiangkou hydropower station
    Geotechnical and Structural Engineering Research Center, Shandong University, Jinan
    250061, China
    不详
    257400, China
    不详
    250013, China
    Tumu Gongcheng Xuebao, 8 (86-95): : 86 - 95
  • [5] Back analysis study on initial geostress field of dam site for Xiluodu hydropower project
    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China
    Yanshilixue Yu Gongcheng Xuebao, 2006, 11 (2305-2312):
  • [6] Field shear creep test and creep parameters inversion for dam zone rock mass of Dagangshan hydropower station
    Zhang Qiang-yong
    Chen Fang
    Yang Wen-dong
    Li Wen-gang
    Wang Jian-hong
    He Ru-ping
    Zeng Ji-quan
    ROCK AND SOIL MECHANICS, 2011, 32 (09) : 2584 - +
  • [7] Analysis of Deformation and Ultimate Bearing Capacity of the Arch Dam of the Dagangshan Hydropower Station
    Guo, Deyu
    Zhang, Lewen
    Wu, Jing
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2025, 25 (02)
  • [8] Numeriacal simulation analysis of 3D initial geostress field for slope of the hydropower station
    Wang, Yu
    Wang, Ruihong
    Deng, Huafeng
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4274 - 4277
  • [9] Inversion analysis of initial geostress in dam site of Guandi hydropower project
    He, Jiang-Da
    Xie, Hong-Qiang
    Wang, Qi-Zhi
    Xiao, Ming-Li
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2009, 31 (02): : 166 - 171
  • [10] Regression analysis of 3D initial geostress in region of underground powerhouse for large hydropower station
    Xie Hong-qiang
    He Jiang-da
    Xiao Ming-li
    ROCK AND SOIL MECHANICS, 2009, 30 (08) : 2471 - 2476