Simulation-based scheduling: Meeting the semiconductor wafer fabrication challenge

被引:0
|
作者
Thompson, M
机构
[1] AutoSimulations Inc
来源
IIE SOLUTIONS | 1996年 / 28卷 / 05期
关键词
Computer aided manufacturing - Computer software - Constraint theory - Decision making - Decision support systems - Inventory control - Planning - Process control - Production control - Resource allocation - Scheduling - Semiconductor device manufacture;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Compared to most discrete manufacturing processes, semiconductor wafer fabrication poses unique planning and scheduling challenges. This article describes the simulation-based finite capacity planning and scheduling software, a tool that allows human planners to make better decisions. Significant improvements to cycle time, throughput, and equipment utilization can be made without adding additional equipment and personnel. The future of these systems is in real-time control and improved diagnostic capability.
引用
收藏
页码:30 / 34
页数:5
相关论文
共 50 条
  • [31] SIMULATION-BASED WIP MANAGEMENT VERSUS SCHEDULING FOR SEMICONDUCTOR MANUFACTURING - A COMPARISON
    Lendermann, Peter
    Gan, Boon Ping
    Lee, Loo Hay
    2014 E-MANUFACTURING AND DESIGN COLLABORATION SYMPOSIUM (EMDC), 2014,
  • [32] Experimental investigation for performance assessment of scheduling policies in semiconductor wafer fabrication-a simulation approach
    Singh, Rashmi
    Mathirajan, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 99 (5-8): : 1503 - 1520
  • [33] A simulation-based experiment for comparing AMHS performance in a semiconductor fabrication facility
    Mackulak, GT
    Savory, P
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2001, 14 (03) : 273 - 280
  • [34] A problem reduction approach for scheduling semiconductor wafer fabrication facilities
    Upasani, Abhijit A.
    Uzsoy, Reha
    Sourirajan, Karthik
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (02) : 216 - 225
  • [35] ANFIS and SA Based Approach to Prediction, Scheduling, and Performance Evaluation for Semiconductor Wafer Fabrication
    Cao Zhengcai
    Zhao Huidan
    Wang Yongji
    CHINESE JOURNAL OF ELECTRONICS, 2013, 22 (01): : 25 - 30
  • [36] Resource-based Petri net Modeling and Scheduling for Semiconductor Wafer Fabrication Systems
    Shao Zhifang
    Liu Zhongying
    ICOSCM 2007 - INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT IN CHINA, 2007, 1
  • [37] Multi-agent-based dynamic scheduling method for semiconductor wafer fabrication facilities
    College of Electronics and Information Engineering, Tongji University, Shanghai 200092, China
    Qinghua Daxue Xuebao, 2007, SUPPL. 2 (1895-1898):
  • [38] Ant Colony Optimization Based Scheduling for a Semiconductor Wafer Fabrication Facility with Bottleneck Stations
    Li, Li
    Qiao, Fei
    Tian, Xiaoyu
    Wu, Qidi
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 520 - 525
  • [39] Simulation Based Correlation Analysis on Performance Issues of Semiconductor Wafer Fabrication Facilities
    Pan, Xingwei
    Li, Li
    Chen, Zhongbo
    Jia, Pengde
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4019 - 4024
  • [40] Model Simplification for Accelerating Simulation-based Evaluation of Dispatching Rules in Wafer Fabrication Facilities
    Chiang, Tsung-Che
    11TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION (ICARCV 2010), 2010, : 2005 - 2011