Scheduling with alternatives: a link between process planning and scheduling

被引:0
|
作者
Weintraub, A [1 ]
Cormier, D [1 ]
Hodgson, T [1 ]
King, R [1 ]
Wilson, J [1 ]
Zozom, A [1 ]
机构
[1] N Carolina State Univ, Dept Ind Engn, Raleigh, NC 27695 USA
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The objective of this research is to develop and evaluate effective, computationally efficient procedures for scheduling jobs in a large-scale manufacturing system involving, for example, over 1000 jobs and over 100 machines. The main performance measure is maximum lateness; and a useful lower bound on maximum lateness is derived from a relaxed scheduling problem in which preemption of jobs is based on the latest finish time of each job at each machine. To construct a production schedule that minimizes maximum lateness, an iterative simulation-based scheduling algorithm operates as follows: (a) job queuing times observed at each machine in the previous simulation iteration are used to compute a refined estimate of the effective due date (slack) for each job at each machine; and (b) in the current simulation iteration, jobs are dispatched at each machine in order of increasing slack. Iterations of the scheduling algorithm terminate when the lower bound on maximum lateness is achieved or the iteration limit is reached. This scheduling algorithm is implemented in Virtual Factory, a Windows-based software package. The performance of Virtual Factory is demonstrated in a suite of randomly generated test problems as well as in a large furniture manufacturing facility. To further reduce maximum lateness, a second scheduling algorithm also incorporates a tabu search procedure that identifies process plans with alternative operations and routings for jobs. This enhancement yields improved schedules that minimize manufacturing costs while satisfying job due dates. An extensive experimental performance evaluation indicates that in a broad range of industrial settings, the second scheduling algorithm can rapidly identify optimal or nearly optimal schedules.
引用
收藏
页码:1093 / 1102
页数:10
相关论文
共 50 条
  • [1] The planning and scheduling process
    Roup, JP
    [J]. HYDROCARBON PROCESSING, 1996, 75 (04): : 157 - &
  • [2] Planning and scheduling in the process industry
    Kallrath, J
    [J]. OR SPECTRUM, 2002, 24 (03) : 219 - 250
  • [3] Effective process planning and scheduling
    Price, Elinor
    [J]. CONTROL ENGINEERING, 2007, 54 (11) : IP1 - +
  • [4] Planning and scheduling in the process industry
    Kallrath J.
    [J]. OR Spectrum, 2002, 24 (3) : 219 - 250
  • [5] The Link Between the Use of Advanced Planning and Scheduling (APS) Modules and Factory Context
    Kristensen, J.
    Asmussen, J. N.
    Waehrens, B. V.
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 634 - 638
  • [6] Integration of process planning and scheduling by exploring the flexibility of process planning
    Zhang, YF
    Saravanan, AN
    Fuh, JYH
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (03) : 611 - 628
  • [7] INTEGRATION OF PROCESS PLANNING AND SCHEDULING FUNCTIONS
    KHOSHNEVIS, B
    CHEN, QM
    [J]. 1989 IIE INTEGRATED SYSTEMS CONFERENCE & SOCIETY FOR INTEGRATED MANUFACTURING CONFERENCE, PROCEEDINGS, 1989, : 415 - 420
  • [8] An approach for integration of process planning and scheduling
    Phanden, Rakesh Kumar
    Jain, Ajai
    Verma, Rajiv
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2013, 26 (04) : 284 - 302
  • [9] An Optimization Tool for Process Planning and Scheduling
    Bettwy, Mathieu
    Deschinkel, Karine
    Gomes, Samuel
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, PT 1, 2014, 438 : 443 - +
  • [10] A collaborative process planning and scheduling system
    Kempenaers, J
    Pinte, J
    Detand, J
    Kruth, JP
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 1996, 25 (01) : 3 - 8