The Link Between the Use of Advanced Planning and Scheduling (APS) Modules and Factory Context

被引:0
|
作者
Kristensen, J. [1 ]
Asmussen, J. N. [1 ]
Waehrens, B. V. [1 ]
机构
[1] Aalborg Univ, Dept Mat & Prod, Aalborg, Denmark
关键词
Action Research; Advanced Planning and Scheduling (APS) system; Capacity planning; Production planning; SUPPLY CHAIN; SYSTEMS; PERFORMANCE; MANAGEMENT;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Through a study of four embedded action research cases within a global OEM, it is investigated how the frequency of use and contribution of an Advanced Planning and Scheduling (APS) module are affected by factory context. The performance contribution of the APS module is found to be high at factories characterized by low planning maturity, but lower for factories with medium planning maturity. For low planning maturity, the APS module is used for improving the configuration of the manufacturing system, whereas high planning maturity is required to capture performance benefits from optimization and scenario planning. Further, it is found that planning complexity at the factory increases both the frequency of use and the contribution of using APS modules. On the basis of the findings, three propositions are formulated on the link between factory context and the use of APS module.
引用
收藏
页码:634 / 638
页数:5
相关论文
共 23 条
  • [1] A CASE STUDY FOR ADVANCED PLANNING AND SCHEDULING (APS)
    Kejia CHEN1 Ping JI2 Qing WANG3 1School of Management
    [J]. Journal of Systems Science and Systems Engineering, 2011, 20 (04) : 460 - 474
  • [2] A case study for advanced planning and scheduling (APS)
    Kejia Chen
    Ping Ji
    Qing Wang
    [J]. Journal of Systems Science and Systems Engineering, 2011, 20 : 460 - 474
  • [3] A case study for advanced planning and scheduling (APS)
    Chen, Kejia
    Ji, Ping
    Wang, Qing
    [J]. JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2011, 20 (04) : 460 - 474
  • [4] Hierarchical models in advanced planning and scheduling (APS)
    Baumann, Michael
    Dimitrov, Todor
    [J]. AT-AUTOMATISIERUNGSTECHNIK, 2008, 56 (02) : 90 - 97
  • [5] Heuristic factory planning algorithm for advanced planning and scheduling
    Kung, Ling-Chieh
    Chern, Ching-Chin
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2513 - 2530
  • [6] A mixed integer programming model for advanced planning and scheduling (APS)
    Chen, Kejia
    Ji, Ping
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (01) : 515 - 522
  • [7] Technical and industrial issues of Advanced Planning and Scheduling (APS) systems
    Hvolby, Hans-Henrik
    Steger-Jensen, Kenn
    [J]. COMPUTERS IN INDUSTRY, 2010, 61 (09) : 845 - 851
  • [8] Enabling green manufacturing using Advanced Planning and Scheduling (APS) technology
    Steger-Jensen, Kenn
    Hvolby, Hans-Henrik
    Dukovska-Popovska, Iskra
    Vestergaard, Sven
    Svensson, Carsten
    [J]. 2019 10TH IEEE INTERNATIONAL CONFERENCE ON COGNITIVE INFOCOMMUNICATIONS (COGINFOCOM 2019), 2019, : 181 - 185
  • [9] Scheduling with alternatives: a link between process planning and scheduling
    Weintraub, A
    Cormier, D
    Hodgson, T
    King, R
    Wilson, J
    Zozom, A
    [J]. IIE TRANSACTIONS, 1999, 31 (11) : 1093 - 1102
  • [10] A note on "A mixed integer programming model for advanced planning and scheduling (APS)"
    Ornek, Arslan
    Ozpeynirci, Selin
    Ozturk, Cemalettin
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 203 (03) : 784 - 785