Scheduling with alternatives: a link between process planning and scheduling

被引:0
|
作者
Weintraub, A [1 ]
Cormier, D [1 ]
Hodgson, T [1 ]
King, R [1 ]
Wilson, J [1 ]
Zozom, A [1 ]
机构
[1] N Carolina State Univ, Dept Ind Engn, Raleigh, NC 27695 USA
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The objective of this research is to develop and evaluate effective, computationally efficient procedures for scheduling jobs in a large-scale manufacturing system involving, for example, over 1000 jobs and over 100 machines. The main performance measure is maximum lateness; and a useful lower bound on maximum lateness is derived from a relaxed scheduling problem in which preemption of jobs is based on the latest finish time of each job at each machine. To construct a production schedule that minimizes maximum lateness, an iterative simulation-based scheduling algorithm operates as follows: (a) job queuing times observed at each machine in the previous simulation iteration are used to compute a refined estimate of the effective due date (slack) for each job at each machine; and (b) in the current simulation iteration, jobs are dispatched at each machine in order of increasing slack. Iterations of the scheduling algorithm terminate when the lower bound on maximum lateness is achieved or the iteration limit is reached. This scheduling algorithm is implemented in Virtual Factory, a Windows-based software package. The performance of Virtual Factory is demonstrated in a suite of randomly generated test problems as well as in a large furniture manufacturing facility. To further reduce maximum lateness, a second scheduling algorithm also incorporates a tabu search procedure that identifies process plans with alternative operations and routings for jobs. This enhancement yields improved schedules that minimize manufacturing costs while satisfying job due dates. An extensive experimental performance evaluation indicates that in a broad range of industrial settings, the second scheduling algorithm can rapidly identify optimal or nearly optimal schedules.
引用
收藏
页码:1093 / 1102
页数:10
相关论文
共 50 条
  • [31] Application of production planning and scheduling in the process industries
    Loos, P
    Allweyer, T
    [J]. COMPUTERS IN INDUSTRY, 1998, 36 (03) : 199 - 208
  • [32] A new approach for integrating process planning with scheduling
    Yang, Weizhou
    Xu, Xun W.
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2011, 42 (04) : 253 - 266
  • [33] Integrated process planning and scheduling in a supply chain
    Moon, Chiung
    Lee, Young Hae
    Jeong, Chan Seok
    Yun, YoungSu
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 1048 - 1061
  • [34] Planning and Scheduling Models for EMAS Productive Process
    Tang, Peng
    Yu, Hongbin
    [J]. MACHINE DESIGN AND MANUFACTURING ENGINEERING II, PTS 1 AND 2, 2013, 365-366 : 553 - 556
  • [35] Genetic algorithms in integrated process planning and scheduling
    NORHASHIMAH MORAD
    AMS ZALZALA
    [J]. Journal of Intelligent Manufacturing, 1999, 10 : 169 - 179
  • [36] Process planning and scheduling optimisation with alternative recipes
    Dziurzanski, Piotr
    Zhao, Shuai
    Scholze, Sebastian
    Zilverberg, Albert
    Krone, Karl
    Indrusiak, Leandro Soares
    [J]. AT-AUTOMATISIERUNGSTECHNIK, 2020, 68 (02) : 140 - 147
  • [37] An integrated scheme for process planning and scheduling in FMS
    Ajai Jain
    P. K. Jain
    I. P. Singh
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 30 : 1111 - 1118
  • [38] Integration of scheduling with computer aided process planning
    Kumar, M
    Rajotia, S
    [J]. JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2003, 138 (1-3) : 297 - 300
  • [39] Overview of planning and scheduling of batch process operations
    Giritligil, S
    Cesur, S
    Kuryel, B
    [J]. DYNAMICS & CONTROL OF PROCESS SYSTEMS 1998, VOLUMES 1 AND 2, 1999, : 455 - 460
  • [40] Multipart setup planning through integration of process planning and scheduling
    Haddadzade, Mohammad
    Razfar, Mohammad Reza
    Zarandi, Mohammad Hossein Fazel
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2016, 230 (06) : 1097 - 1113