共 50 条
- [41] A comparison between robust and risk-based optimization under uncertainty [J]. Structural and Multidisciplinary Optimization, 2015, 52 : 479 - 492
- [42] PRIORITIZATION OF RAIL DEFECT INSPECTION: A RISK-BASED OPTIMIZATION APPROACH [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2017, 2017,
- [43] Risk-based Multiobjective Optimization Model for Bridge Maintenance Planning [J]. ISCM II AND EPMESC XII, PTS 1 AND 2, 2010, 1233 : 477 - +
- [45] Risk-Based Inspection and its Application to the Optimization of Chemical Plants [J]. PRES 2011: 14TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1 AND 2, 2011, 25 : 201 - +
- [46] Risk-based maintenance optimization of aging highway bridge decks [J]. ADVANCES IN ENGINEERING STRUCTURES, MECHANICS & CONSTRUCTION, PROCEEDINGS, 2006, 140 : 723 - 734
- [47] Modeling uncertainty of expert elicitation for use in risk-based optimization [J]. Annals of Operations Research, 2019, 280 : 189 - 210