PRIORITIZATION OF RAIL DEFECT INSPECTION: A RISK-BASED OPTIMIZATION APPROACH

被引:0
|
作者
Zhou, Kang [1 ]
机构
[1] Rutgers State Univ, Piscataway, NJ 08855 USA
关键词
FATIGUE-CRACK GROWTH; WAVE-PROPAGATION; BREAKS; MODEL;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Broken rail is the most common type of mainline derailment cause on freight railroads in the United States. Detection and removal of rail defects is important for reducing the risk due to broken-rail-caused derailments. The current practice is to periodically inspect rails using non-destructive technologies, particularly ultrasonic inspection. Determining and prioritizing the frequency of rail defect inspection is an important decision in broken rail risk management. A generalized, risk-based mixed integer nonlinear programming (MINLP) model is developed which can optimize segment-specific rail defect inspection frequency to minimize route broken rail risk, especially under limited inspection resources. A numerical example to, optimize the inspection frequency is used to illustrate the application of the model. The result analysis states that the optimization approach can lead to a risk reduction of broken rail compared to an empirical heuristic that all segments on the same route are tested at an equal frequency. A computer-aided decision making tool called "Rail Risk Optimizer" can be developed and implemented based on this risk-based optimization algorithm that automatically recommend an optimal segment-specific inspection scheduling. The tool will consider the risk factors such as rail age and annual traffic density to determine the segment-specific risk level. The research methodology and the practice-ready optimization tool can aid the railroad industry to mitigate broken rail risk in a cost-efficient manner.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Risk-Based Optimization of Rail Defect Inspection Frequency for Petroleum Crude Oil Transportation
    Liu, Xiang
    Dick, C. Tyler
    [J]. TRANSPORTATION RESEARCH RECORD, 2016, (2545) : 27 - 35
  • [2] Risk-Based Prioritization of Construction Inspection
    Yuan, Chenxi
    Park, Jaehyun
    Xu, Xin
    Cai, Hubo
    Abraham, Dulcy M.
    Bowman, Mark D.
    [J]. TRANSPORTATION RESEARCH RECORD, 2018, 2672 (26) : 96 - 105
  • [3] Tanker inspection and a risk-based approach
    Ma, K
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 4, 1998, : 504 - 512
  • [4] Risk-based Inspection Optimization of the Deteriorating System
    Tan Lin
    Gong Shiyu
    Guo Bo
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 1874 - 1878
  • [5] RISK-BASED INSPECTION OPTIMIZATION FOR VALVE INSPECTIONS
    Vibien, Patrick M.
    Joyal, David A.
    Oliphant, Ken E.
    Luff, William
    [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 3, 2018,
  • [6] Risk-Based Optimization of Inspection Planning in Ships
    Bharadwaj, Ujjwal
    Wintle, John
    [J]. JOURNAL OF SHIP PRODUCTION AND DESIGN, 2011, 27 (03): : 111 - 117
  • [7] Risk-based prioritization and its application to inspection of valves in the water sector
    Marlow, David R.
    Beale, David J.
    Mashford, John S.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2012, 100 : 67 - 74
  • [8] RISK-BASED BRIDGE MANAGEMENT - OPTIMIZATION AND INSPECTION SCHEDULING
    CESARE, M
    SANTAMARINA, JC
    TURKSTRA, CJ
    VANMARCKE, E
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (06) : 897 - 902
  • [9] Risk-Based Prioritization Approach to Construction Inspections for Transportation Projects
    Mohamad, Mamdouh
    Tran, Dai Q.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (01)
  • [10] An Optimal Approach for Semiquantitative Risk-Based Inspection of Pipelines
    Eskandarzade, Mehdi
    Shahrivar, Reza
    Ratnayake, R. M. Chandima
    Bukhari, Umair Niaz
    [J]. JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2022, 13 (03)