Temperature of Connections During Fire on Steel Framed Building

被引:6
|
作者
Chlouba, Jiri [1 ]
Wald, Frantiek [1 ]
Sokol, Zdenek [1 ]
机构
[1] Czech Tech Univ, Dept Steel & Timber Struct, CZ-16629 Prague, Czech Republic
关键词
fire design; connections; fire test; temperature; eurocodes;
D O I
10.1007/BF03249479
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To study the global structural and thermal behaviour of buildings in fire, a research project was conducted including a full-scale test on a three storey steel frame building at Mittal Steel Ostrava before demolition. The main goal of the experiment was to verify the method for predicting joint temperatures and to improve it for the cooling phase. The fire compartment extending over a floor area of 24 m(2) was built on the second floor. The fire load was 140 kg/m(2) of wood and the ventilation was limited to an opening of 1,400x 1,970 mm. This paper presents the time-temperature curves showing the development of the fire in the compartment and in the primary and secondary beams and its header plate connections. Comparisons are made between the test results and the temperatures predicted by the structural Eurocodes. The sensitivity of the connection behaviour to the estimated temperatures and associated degradation in material properties during the fire is demonstrated.
引用
收藏
页码:47 / 55
页数:9
相关论文
共 50 条
  • [21] Experimental study of two-way reinforced concrete slab subjected to fire in a steel-framed building
    Yang, Zhi-Nian
    Dong, Yu-Li
    Gongcheng Lixue/Engineering Mechanics, 2013, 30 (04): : 337 - 344
  • [22] STEEL FRAMED BUILDING PREFABRICATION SYSTEM FOR MEDIUM SIZE EXCHANGE BUILDING
    HORITAKE, H
    MATSUURA, F
    MATSUSHITA, I
    KUWAHARA, T
    REVIEW OF THE ELECTRICAL COMMUNICATIONS LABORATORIES, 1978, 26 (1-2): : 199 - 214
  • [23] Experimental and Numerical Studies of Multi-compartment Spreading Fire in a Full-Scale Steel Framed Building
    Shipeng Ruan
    Jincheng Zhao
    Zhensen Song
    Liping Duan
    Fire Technology, 2022, 58 : 3235 - 3260
  • [24] The introduction and the influence of semi-rigid connections in framed structures subjected to fire
    Gernay, Thomas
    Franssen, Jean-Marc
    FIRE SAFETY JOURNAL, 2020, 114
  • [25] Design of light steel-framed walls for fire resistance
    Winstone Wallboards Ltd, Lower Hutt, New Zealand
    Fire Mater, 2 (79-96):
  • [26] System identification of steel framed structures with semi-rigid connections
    Katkhuda, Hasan N.
    Dwairi, Hazim M.
    Shatarat, Nasim
    STRUCTURAL ENGINEERING AND MECHANICS, 2010, 34 (03) : 351 - 366
  • [27] Earthquake and Postearthquake Fire Testing of a Midrise Cold-Formed Steel-Framed Building. I: Building Response and Physical Damage
    Hutchinson, Tara C.
    Wang, Xiang
    Hegemier, Gilbert
    Kamath, Praveen
    Meacham, Brian
    JOURNAL OF STRUCTURAL ENGINEERING, 2021, 147 (09)
  • [28] Strategies to increase the survivability of steel connections in fire
    Safari, Pouria
    Broujerdian, Vahid
    STRUCTURES, 2020, 28 : 2335 - 2354
  • [29] Fire resistance of bolted steel-glulam-steel connections
    Key Laboratory of Concrete & Prestressed Concrete Structures of the Ministry of Education, Southeast University, Nanjing
    Jiangsu
    210096, China
    不详
    200032, China
    Huanan Ligong Daxue Xuebao, 2 (58-65):
  • [30] The Role of Connections in the Response of Steel Frames to Fire
    Burgess, Ian
    Davison, John Buick
    Dong, Gang
    Huang, Shan-Shan
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (04) : 449 - 461