Generation System Planning with Consideration of Load Forecast Uncertainty and Energy Limited Units

被引:2
|
作者
Tiabrat, Pornthep [1 ]
Eua-arporn, Bundhit [1 ]
机构
[1] Chulalongkorn Univ, Fac Engn, Dept Elect Engn, Bangkok 10330, Thailand
关键词
Reliability assessment; loss-of-load expectation (LOLE); energy limited; Monte Carlo simulations;
D O I
10.1109/ECTICON.2008.4600568
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a method for generation system expansion planning with consideration of load forecast uncertainty and energy limited units. The applied method is based on predefined risk criteria, which is evaluated by a probabilistic methodology to ensure adequate and appropriate power supply for long-term demand. Monte Carlo simulation technique is applied to obtain the results which can be used to assist the decision maker in developing a power expansion plan. The proposed method has been tested with a modified Thailand power system including pumped storage units. The results illustrate (he impact of demand uncertainty on the number of new generators needed in each studied year.
引用
收藏
页码:869 / 872
页数:4
相关论文
共 50 条
  • [31] Supply Reliability and Generation Cost Analysis Due to Load Forecast Uncertainty in Unit Commitment Problems
    Wang, Bo
    Li, You
    Watada, Junzo
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) : 2242 - 2252
  • [32] Effects of an Angle Droop Controller on the Performance of Distributed Generation Units with Load Uncertainty and Nonlinearity
    Niya, M. S. Koupaei
    Kargar, Abbas
    Derakhshandeh, S. Y.
    [J]. JOURNAL OF POWER ELECTRONICS, 2017, 17 (02) : 551 - 560
  • [33] Consideration of uncertainty of information on load and generation values under daily reconfiguration of primary distribution network
    Golub, Irina
    Voitov, Oleg
    Boloev, Evgeny
    Semenova, Lyudmila
    [J]. METHODOLOGICAL PROBLEMS IN RELIABILITY STUDY OF LARGE ENERGY SYSTEMS (RSES 2017), 2017, 25
  • [34] Integration System of Load and Universal Energy Generation
    Alves Pereira, Paulo da Fonseca
    [J]. 2013 IEEE PES CONFERENCE ON INNOVATIVE SMART GRID TECHNOLOGIES (ISGT LATIN AMERICA), 2013,
  • [35] Optimal reserve portion of energy storage system with the consideration of data uncertainty
    Kim, Jangkyum
    Han, Jaeseob
    Choi, Jun Kyun
    Kim, Kyuntae
    Kim, Kangsan
    [J]. 2019 10TH INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGY CONVERGENCE (ICTC): ICT CONVERGENCE LEADING THE AUTONOMOUS FUTURE, 2019, : 497 - 500
  • [36] Battery Energy Storage System Planning Based on Super-Resolution Source-Load Uncertainty Reconstruction
    Wang, Qian
    Zhang, Xueguang
    Xu, Dianguo
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2024, 15 (01) : 581 - 594
  • [37] AN ANALYTICAL TECHNIQUE FOR THE RELIABILITY MODELING OF GENERATION SYSTEMS INCLUDING ENERGY LIMITED UNITS
    SINGH, C
    CHEN, Q
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1987, 2 (01) : 123 - 128
  • [38] SHORT-TERM LOAD FORECAST IN ELECTRIC ENERGY SYSTEM IN BULGARIA
    Asenova, Irina
    Georgiev, Dimitar
    [J]. ADVANCES IN ELECTRICAL AND ELECTRONIC ENGINEERING, 2010, 8 (04) : 102 - 106
  • [39] A study of generation control system in consideration of renewable energy source
    Power and Industrial Systems R and D Center, Toshiba Corp., Toshiba-cho, Fuchu
    183-8511, Japan
    不详
    212-8585, Japan
    不详
    183-8511, Japan
    不详
    461-8680, Japan
    [J]. IEEJ Trans. Power Energy, 1600, 2 (93-101):
  • [40] Joint expansion planning of distribution network with uncertainty of demand load and renewable energy
    Zhou, Siyu
    Han, Yang
    Chen, Shuheng
    Yang, Ping
    Wang, Congling
    Zalhaf, Amr S.
    [J]. ENERGY REPORTS, 2022, 8 : 310 - 319