Model for the techno-economic analysis of common work of wind power and CCGT power plant to offer constant level of power in the electricity market

被引:0
|
作者
Tomsic, Z. [1 ]
Rajsl, I. [1 ]
Filipovic, M. [1 ]
机构
[1] Univ Zagreb, Fac Elect Engn & Comp, Zagreb, Croatia
关键词
Wind plant; CCGT plant; electricity market; PLEXOS model;
D O I
10.1051/e3sconf/20172309002
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Wind power varies over time, mainly under the influence of meteorological fluctuations. The variations occur on all time scales. Understanding these variations and their predictability is of key importance for the integration and optimal utilization of wind in the power system. There are two major attributes of variable generation that notably impact the participation on power exchanges: Variability (the output of variable generation changes and resulting in fluctuations in the plant output on all time scales) and Uncertainty (the magnitude and timing of variable generation output is less predictable, wind power output has low levels of predictability). Because of these variability and uncertainty wind plants cannot participate to electricity market, especially to power exchanges. For this purpose, the paper presents techno-economic analysis of work of wind plants together with combined cycle gas turbine (CCGT) plant as support for offering continues power to electricity market. A model of wind farms and CCGT plant was developed in program PLEXOS based on real hourly input data and all characteristics of CCGT with especial analysis of techno-economic characteristics of different types of starts and stops of the plant. The Model analyzes the followings: costs of different start-stop characteristics (hot, warm, cold start-ups and shutdowns) and part load performance of CCGT. Besides the costs, the technical restrictions were considered such as start-up time depending on outage duration, minimum operation time, and minimum load or peaking capability. For calculation purposes, the following parameters are necessary to know in order to be able to economically evaluate changes in the start-up process: ramp up and down rate, time of start time reduction, fuel mass flow during start, electricity production during start, variable cost of start-up process, cost and charges for life time consumption for each start and start type, remuneration during start up time regarding expected or unexpected starts, the cost and revenues for balancing energy (important when participating in electricity market), and the cost or revenues for CO2-certificates. Main motivation for this analysis is to investigate possibilities to participate on power exchanges by offering continues guarantied power from wind plants by backing-up them with CCGT power plant.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Techno-economic assessment of a power-to-green methanol plant
    Pratschner, Simon
    Radosits, Frank
    Ajanovic, Amela
    Winter, Franz
    JOURNAL OF CO2 UTILIZATION, 2023, 75
  • [32] Techno-economic analysis of a combined concentrated solar power and water desalination plant
    Moharram, Nour A.
    Bayoumi, Seif
    Hanafy, Ahmed A.
    El-Maghlany, Wael M.
    ENERGY CONVERSION AND MANAGEMENT, 2021, 228
  • [33] Techno-economic analysis of a proposed 10 MW geothermal power plant in Fiji
    Prasad, Ravita D.
    Raturi, Atul
    Sustainable Energy Technologies and Assessments, 2022, 53
  • [34] Techno-Economic Analysis of a Carbon Capture Chemical Looping Combustion Power Plant
    Ogidiama, Oghare Victor
    Abu Zahra, Mohammad
    Shamim, Tariq
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2018, 140 (11):
  • [35] Techno-Economic Analysis of Solar Power Plant Project in Binh Thuan, Vietnam
    Phuong Truong Le
    Van Dung Nguyen
    Phuong Long Le
    PROCEEDINGS OF 2018 4TH INTERNATIONAL CONFERENCE ON GREEN TECHNOLOGY AND SUSTAINABLE DEVELOPMENT (GTSD), 2018, : 82 - 85
  • [36] Techno-economic Analysis of the Future European Power System
    Wiernes, P. E.
    Mercado, P. E.
    Moser, A.
    2014 CLEMSON UNIVERSITY POWER SYSTEMS CONFERENCE (PSC), 2014,
  • [37] A Model for Techno-Economic Optimization of Wind Power Combined with Hydrogen Production in Weak Grids
    Greiner, Christopher J.
    Korpas, Magnus
    Gjengedal, Terje
    EPE JOURNAL, 2009, 19 (02) : 52 - 59
  • [38] Game Model of Electricity Market Involving Virtual Power Plant Composed of Wind Power and Electric Vehicles
    Wang X.
    Zhang H.
    Zhang S.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (03): : 155 - 162
  • [39] Techno-economic analysis and Monte Carlo simulation for green hydrogen production using offshore wind power plant
    Jang, Dohyung
    Kim, Kilwon
    Kim, Kyong-Hwan
    Kang, Sanggyu
    ENERGY CONVERSION AND MANAGEMENT, 2022, 263
  • [40] WIND POWER PLANT AND POWER-TO-GAS SYSTEM COUPLED WITH NATURAL GAS GRID INFRASTRUCTURE: TECHNO-ECONOMIC OPTIMIZATION OF OPERATION
    Guandalini, Giulio
    Campanari, Stefano
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 9, 2015,