Model for the techno-economic analysis of common work of wind power and CCGT power plant to offer constant level of power in the electricity market

被引:0
|
作者
Tomsic, Z. [1 ]
Rajsl, I. [1 ]
Filipovic, M. [1 ]
机构
[1] Univ Zagreb, Fac Elect Engn & Comp, Zagreb, Croatia
关键词
Wind plant; CCGT plant; electricity market; PLEXOS model;
D O I
10.1051/e3sconf/20172309002
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Wind power varies over time, mainly under the influence of meteorological fluctuations. The variations occur on all time scales. Understanding these variations and their predictability is of key importance for the integration and optimal utilization of wind in the power system. There are two major attributes of variable generation that notably impact the participation on power exchanges: Variability (the output of variable generation changes and resulting in fluctuations in the plant output on all time scales) and Uncertainty (the magnitude and timing of variable generation output is less predictable, wind power output has low levels of predictability). Because of these variability and uncertainty wind plants cannot participate to electricity market, especially to power exchanges. For this purpose, the paper presents techno-economic analysis of work of wind plants together with combined cycle gas turbine (CCGT) plant as support for offering continues power to electricity market. A model of wind farms and CCGT plant was developed in program PLEXOS based on real hourly input data and all characteristics of CCGT with especial analysis of techno-economic characteristics of different types of starts and stops of the plant. The Model analyzes the followings: costs of different start-stop characteristics (hot, warm, cold start-ups and shutdowns) and part load performance of CCGT. Besides the costs, the technical restrictions were considered such as start-up time depending on outage duration, minimum operation time, and minimum load or peaking capability. For calculation purposes, the following parameters are necessary to know in order to be able to economically evaluate changes in the start-up process: ramp up and down rate, time of start time reduction, fuel mass flow during start, electricity production during start, variable cost of start-up process, cost and charges for life time consumption for each start and start type, remuneration during start up time regarding expected or unexpected starts, the cost and revenues for balancing energy (important when participating in electricity market), and the cost or revenues for CO2-certificates. Main motivation for this analysis is to investigate possibilities to participate on power exchanges by offering continues guarantied power from wind plants by backing-up them with CCGT power plant.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] A techno-economic & cost analysis of a turbine power plant: A case study for sugar plant
    Taner, Tolga
    Sivrioglu, Mecit
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 78 : 722 - 730
  • [22] Techno-economic analysis of a biomass gasification power plant dealing with forestry residues blends for electricity production in Portugal
    Cardoso, Joao
    Silva, Valter
    Eusebio, Daniela
    JOURNAL OF CLEANER PRODUCTION, 2019, 212 : 741 - 753
  • [23] Techno-economic analysis of oxy-fuel power plant for coal and biomass combined with a power-to-gas plant
    Sohn, Geun
    Ryu, Ju-yeol
    Park, Hyemin
    Park, Sungho
    ENERGY FOR SUSTAINABLE DEVELOPMENT, 2021, 64 : 47 - 58
  • [24] Techno-Economic Analysis of Concentrated Solar Power Plants in Terms of Levelized Cost of Electricity
    Musi, Richard
    Grange, Benjamin
    Sgouridis, Sgouris
    Guedez, Rafael
    Armstrong, Peter
    Slocum, Alexander
    Calvet, Nicolas
    INTERNATIONAL CONFERENCE ON CONCENTRATING SOLAR POWER AND CHEMICAL ENERGY SYSTEMS (SOLARPACES 2016), 2017, 1850
  • [25] Techno-economic analysis of a power to biogas system operated based on fluctuating electricity price
    Paakkonen, A.
    Tolvanen, H.
    Rintala, J.
    RENEWABLE ENERGY, 2018, 117 : 166 - 174
  • [26] TECHNO-ECONOMIC EVALUATION OF AN IGCC POWER PLANT WITH CARBON CAPTURE
    Majoumerd, Mohammad Mansouri
    Assadi, Mohsen
    Breuhaus, Peter
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2013, VOL 2, 2013,
  • [27] Techno-Economic Analysis of Electricity Generation by Photovoltaic Power Plants Equipped with Trackers in Iran
    Tafazoli, Mehdi
    Salimi, Mohsen
    Zeinalidanaloo, Saeed
    Mashayekh, Javad
    Amidpour, Majid
    ENERGIES, 2023, 16 (01)
  • [28] Techno-economic analysis of a hybrid solar Thermal-PV power plant
    Khajepour, Sadegh
    Ameri, Mehran
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2020, 42
  • [29] Techno-economic Analysis of Solar Photovoltaic Power Plant for Delhi Secretariat Building
    Sharma, Abhishek
    Mahajan, Priya
    Garg, Rachana
    PROCEEDINGS OF THE FIRST IEEE INTERNATIONAL CONFERENCE ON POWER ELECTRONICS, INTELLIGENT CONTROL AND ENERGY SYSTEMS (ICPEICES 2016), 2016,
  • [30] Techno-economic analysis of a proposed 10 MW geothermal power plant in Fiji
    Prasad, Ravita D.
    Raturi, Atul
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2022, 53