Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines

被引:30
|
作者
Chen, CL [1 ]
Liu, CL [1 ]
Feng, XD [1 ]
Shao, HH [1 ]
机构
[1] Shanghai Jiao Tong Univ, Inst Automat, Shanghai 200030, Peoples R China
关键词
D O I
10.1021/ie010465d
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The short-term scheduling of multiproduct single-stage batch plants with parallel lines involves the constraints concerning the release times and due dates of orders, as well as the sequence-dependent setup times and forbidden subsequences of production orders and the ready times of units. Taking the above constraints into consideration, this paper develops a short-term scheduling model for the multiproduct single-stage batch plants with parallel lines using the continuous-time domain representation and the notation of time slot. When the model is developed, the allocation of orders and units to time slots is represented by two sets of binary variables. The model is formulated as a mixed-integer linear programming (MILP) problem. It not only involves fewer binary variables than any other model based on the notation of time slot (Pinto, J. M.; Grossman, I. E. Ann. Oper. Res. 1998, 81, 433) but also can be used to optimize several types of objective functions. Based on the characteristics of the model and multiproduct single-stage batch plants, some heuristic rules are introduced. The rational employment of these heuristic rules can cut down the size of the model and has no effect on the optimality of the scheduling problem. A number of computational examples show that the optimal scheduling can be obtained by solving the MILP model in reasonable CPU time, especially when the scheduling problem involving several identical orders is considered.
引用
收藏
页码:1249 / 1260
页数:12
相关论文
共 50 条
  • [41] Optimal multiperiod scheduling of multiproduct batch plants under demand uncertainty
    Zhu, Jin
    Gu, Xingsheng
    Gu, Wei
    KYBERNETES, 2011, 40 (5-6) : 871 - 882
  • [42] OPTIMAL SYNTHESIS OF MULTIPRODUCT BATCH PLANTS WITH CYCLIC SCHEDULING AND INVENTORY CONSIDERATIONS
    VOUDOURIS, VT
    GROSSMANN, IE
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1993, 32 (09) : 1962 - 1980
  • [43] A slot-based formulation for single-stage multiproduct batch plants with multiple orders per product
    Lim, MF
    Karimi, IA
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (09) : 1914 - 1924
  • [44] Optimal scheduling of single stage batch plants with direct heat integration
    Castro, Pedro M.
    Custodio, Bruno
    Matos, Henrique A.
    COMPUTERS & CHEMICAL ENGINEERING, 2015, 82 : 172 - 185
  • [45] Unit Slots Based Short-Term Scheduling for Multipurpose Batch Plants
    Susarla, Naresh
    Li, Jie
    Karimi, I. A.
    10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2009, 27 : 1989 - 1994
  • [46] Short-term scheduling in batch plants: A generic approach with evolutionary computation
    Heinonen, J
    Pettersson, F
    EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING - 13, 2003, 14 : 671 - 676
  • [47] Short-term scheduling of batch plants with multiple intermediate due dates
    Ierapetritou, MG
    Hené, TS
    Floudas, CA
    COMPUTERS & CHEMICAL ENGINEERING, 1999, 23 : S515 - S518
  • [48] Continuous time formulation of short-term scheduling for pipeless batch plants
    Lee, KH
    Chung, S
    Lee, HK
    Lee, IB
    JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, 2001, 34 (10) : 1267 - 1278
  • [49] Short-term scheduling of multistage batch plants with unlimited intermediate storage
    Castro, Pedro M.
    Novais, Augusto Q.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2008, 47 (16) : 6126 - 6139
  • [50] A rule-based genetic algorithm for the scheduling of single-stage multi-product batch plants with parallel units
    He, Yaohua
    Hui, Chi-Wai
    COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (12) : 3067 - 3083