Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines

被引:30
|
作者
Chen, CL [1 ]
Liu, CL [1 ]
Feng, XD [1 ]
Shao, HH [1 ]
机构
[1] Shanghai Jiao Tong Univ, Inst Automat, Shanghai 200030, Peoples R China
关键词
D O I
10.1021/ie010465d
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The short-term scheduling of multiproduct single-stage batch plants with parallel lines involves the constraints concerning the release times and due dates of orders, as well as the sequence-dependent setup times and forbidden subsequences of production orders and the ready times of units. Taking the above constraints into consideration, this paper develops a short-term scheduling model for the multiproduct single-stage batch plants with parallel lines using the continuous-time domain representation and the notation of time slot. When the model is developed, the allocation of orders and units to time slots is represented by two sets of binary variables. The model is formulated as a mixed-integer linear programming (MILP) problem. It not only involves fewer binary variables than any other model based on the notation of time slot (Pinto, J. M.; Grossman, I. E. Ann. Oper. Res. 1998, 81, 433) but also can be used to optimize several types of objective functions. Based on the characteristics of the model and multiproduct single-stage batch plants, some heuristic rules are introduced. The rational employment of these heuristic rules can cut down the size of the model and has no effect on the optimality of the scheduling problem. A number of computational examples show that the optimal scheduling can be obtained by solving the MILP model in reasonable CPU time, especially when the scheduling problem involving several identical orders is considered.
引用
收藏
页码:1249 / 1260
页数:12
相关论文
共 50 条
  • [31] Optimal Scheduling of Multistage, Multiproduct, Batch Plants with Parallel Units and Sequence Dependent Changeovers
    Castro, Pedro M.
    Novais, Augusto Q.
    19TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2009, 26 : 405 - 409
  • [32] An Extended Formulation for the Flexible Short-Term Scheduling of Multiproduct Semicontinuous Plants
    Capon-Garcia, Elisabet
    Ferrer-Nadal, Sergio
    Graells, Moises
    Puigjaner, Luis
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (04) : 2009 - 2019
  • [33] Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines
    Erdirik-Dogan, Muge
    Grossmann, Ignacio E.
    COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (11) : 2664 - 2683
  • [34] INCORPORATING SCHEDULING IN THE OPTIMAL-DESIGN OF MULTIPRODUCT BATCH PLANTS
    BIREWAR, DB
    GROSSMANN, IE
    COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) : 141 - 161
  • [35] An effective formulation for short-term scheduling of multipurpose batch plants
    Chen, CL
    Zong, XJ
    Shao, HH
    Dai, XM
    PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 4333 - 4334
  • [36] Modeling and Optimization for Short-term Scheduling of Multipurpose Batch Plants
    Chen Guohui
    Yan Liexiang
    Shi Bin
    CHINESE JOURNAL OF CHEMICAL ENGINEERING, 2014, 22 (06) : 682 - 689
  • [37] Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers
    Erdirik-Dogan, Muge
    Grossmann, Ignacio E.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2008, 47 (04) : 1159 - 1183
  • [38] MILP-based approaches for medium-term planning of single-stage continuous multiproduct plants with parallel units
    Liu S.
    Pinto J.M.
    Papageorgiou L.G.
    Computational Management Science, 2010, 7 (4) : 407 - 435
  • [39] Simultaneous batching and scheduling of single stage batch plants with parallel units
    Castro, Pedro M.
    Erdirik-Dogan, Muge
    Grossmann, Ignacio E.
    AICHE JOURNAL, 2008, 54 (01) : 183 - 193
  • [40] A matheuristic approach for the design of multiproduct batch plants with parallel production lines
    Verbiest, Floor
    Cornelissens, Trijntje
    Springael, Johan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (03) : 933 - 947