共 50 条
- [21] Iterative heuristics for permutation flow shops with total flowtime minimization [J]. INFORMATION TECHNOLOGY FOR BALANCED MANUFACTURING SYSTEMS, 2006, 220 : 349 - +
- [22] Optimally Scheduling a Job-Shop with Operators and Total Flow Time Minimization [J]. ADVANCES IN ARTIFICIAL INTELLIGENCE, 2011, 7023 : 193 - 202
- [23] RULE BASED HEURISTIC APPROACH FOR MINIMIZING TOTAL FLOW TIME IN PERMUTATION FLOW SHOP SCHEDULING [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2015, 22 (01): : 25 - 32
- [25] A heuristic for no-wait flow shop scheduling [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (5-8): : 1327 - 1338
- [26] An effective hybrid heuristic for flow shop scheduling [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 21 (01): : 38 - 44
- [27] An effective constructive heuristic for permutation flow shop scheduling problem with total flow time criterion [J]. The International Journal of Advanced Manufacturing Technology, 2017, 90 : 93 - 107
- [28] A heuristic for no-wait flow shop scheduling [J]. The International Journal of Advanced Manufacturing Technology, 2013, 68 : 1327 - 1338
- [30] An effective constructive heuristic for permutation flow shop scheduling problem with total flow time criterion [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 90 (1-4): : 93 - 107