An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports

被引:86
|
作者
Tavakkoli-Moghaddam, R. [1 ]
Makui, A. [2 ]
Salahi, S. [3 ]
Bazzazi, M. [4 ]
Taheri, F. [4 ]
机构
[1] Univ Tehran, Coll Engn, Dept Ind Engn, Tehran, Iran
[2] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[3] Islamic Azad Univ, Dept Ind Engn, Sci & Res Branch, Tehran, Iran
[4] Mazandaran Univ Sceince & Technol, Dept Ind Engn, Babol Sar, Iran
关键词
BERTH ALLOCATION;
D O I
10.1016/j.cie.2008.05.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a novel, mixed-integer programming (MIP) model for the quay crane (QC) scheduling and assignment problem, namely QCSAP, in a container port (terminal). Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper, thus, proposes a genetic algorithm (GA) to solve the above-mentioned QCSAP for the real-world situations. Further, the efficiency of the proposed CA is compared against the LINGO software package in terms of computational times for small-sized problems. Our computational results suggest that the proposed CA is able to solve the QCSAP, especially for large sizes. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:241 / 248
页数:8
相关论文
共 50 条
  • [41] Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost
    Jiang, Meixian
    Feng, Jiajia
    Zhou, Jian
    Zhou, Lin
    Ma, Fangzheng
    Wu, Guanghua
    Zhang, Yuqiu
    [J]. SUSTAINABILITY, 2023, 15 (06)
  • [42] An efficient approach for solving yard crane scheduling in a container terminal
    He J.-L.
    Zhang W.-M.
    Huang Y.-F.
    Yan W.
    [J]. Journal of Shanghai Jiaotong University (Science), 2013, 18 (5) : 606 - 619
  • [43] Integration of Berth Allocation and Quay Crane Assignment in Tidal Container Ports
    陆志强
    吴文
    韩笑乐
    NIRAVONG Juliane
    [J]. Journal of Donghua University(English Edition), 2015, 32 (04) : 559 - 564
  • [44] Mathematical model for quay crane assignment problem with tidal constraints
    Arango Pastrana, Carlos Alberto
    Vidales-Velez, Cristhian
    Molina Agudelo, Jhon Edward
    Bravo Bastidas, Juan Jose
    Vargas Acuna, Leidy Carolina
    [J]. INGE CUC, 2021, 17 (01) : 177 - 187
  • [45] A Branch-and-Price Algorithm to Solve a Quay Crane Scheduling Problem
    Kenan, Nabil
    Diabat, Ali
    [J]. COMPLEX ADAPTIVE SYSTEMS, 2015, 2015, 61 : 527 - 532
  • [46] A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
    Fu, Yi-Min
    Diabat, Ali
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1194 - 1201
  • [47] An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
    Sun, Defeng
    Tang, Lixin
    Baldacci, Roberto
    Lim, Andrew
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (01) : 271 - 283
  • [48] Solving methods for the quay crane scheduling problem at port of Tripoli-Lebanon
    Skaf, Ali
    Lamrous, Sid
    Hammoudan, Zakaria
    Manier, Marie-Ange
    [J]. RAIRO-OPERATIONS RESEARCH, 2021, 55 (01) : 115 - 133
  • [49] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [50] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    [J]. PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258