An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports

被引:86
|
作者
Tavakkoli-Moghaddam, R. [1 ]
Makui, A. [2 ]
Salahi, S. [3 ]
Bazzazi, M. [4 ]
Taheri, F. [4 ]
机构
[1] Univ Tehran, Coll Engn, Dept Ind Engn, Tehran, Iran
[2] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[3] Islamic Azad Univ, Dept Ind Engn, Sci & Res Branch, Tehran, Iran
[4] Mazandaran Univ Sceince & Technol, Dept Ind Engn, Babol Sar, Iran
关键词
BERTH ALLOCATION;
D O I
10.1016/j.cie.2008.05.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a novel, mixed-integer programming (MIP) model for the quay crane (QC) scheduling and assignment problem, namely QCSAP, in a container port (terminal). Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper, thus, proposes a genetic algorithm (GA) to solve the above-mentioned QCSAP for the real-world situations. Further, the efficiency of the proposed CA is compared against the LINGO software package in terms of computational times for small-sized problems. Our computational results suggest that the proposed CA is able to solve the QCSAP, especially for large sizes. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:241 / 248
页数:8
相关论文
共 50 条
  • [41] Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost
    Jiang, Meixian
    Feng, Jiajia
    Zhou, Jian
    Zhou, Lin
    Ma, Fangzheng
    Wu, Guanghua
    Zhang, Yuqiu
    SUSTAINABILITY, 2023, 15 (06)
  • [42] An efficient approach for solving yard crane scheduling in a container terminal
    He J.-L.
    Zhang W.-M.
    Huang Y.-F.
    Yan W.
    Journal of Shanghai Jiaotong University (Science), 2013, 18 (5) : 606 - 619
  • [43] Model for disruption management of berth allocation & quay crane scheduling in container terminals
    Zeng, Qing-Cheng
    Hu, Xiang-Pei
    Yang, Zhong-Zhen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
  • [44] Integration of Berth Allocation and Quay Crane Assignment in Tidal Container Ports
    陆志强
    吴文
    韩笑乐
    NIRAVONG Juliane
    Journal of Donghua University(English Edition), 2015, 32 (04) : 559 - 564
  • [45] Mathematical model for quay crane assignment problem with tidal constraints
    Arango Pastrana, Carlos Alberto
    Vidales-Velez, Cristhian
    Molina Agudelo, Jhon Edward
    Bravo Bastidas, Juan Jose
    Vargas Acuna, Leidy Carolina
    INGE CUC, 2021, 17 (01) : 177 - 187
  • [46] A Branch-and-Price Algorithm to Solve a Quay Crane Scheduling Problem
    Kenan, Nabil
    Diabat, Ali
    COMPLEX ADAPTIVE SYSTEMS, 2015, 2015, 61 : 527 - 532
  • [47] A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
    Fu, Yi-Min
    Diabat, Ali
    APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1194 - 1201
  • [48] Solving methods for the quay crane scheduling problem at port of Tripoli-Lebanon
    Skaf, Ali
    Lamrous, Sid
    Hammoudan, Zakaria
    Manier, Marie-Ange
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (01) : 115 - 133
  • [49] An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
    Sun, Defeng
    Tang, Lixin
    Baldacci, Roberto
    Lim, Andrew
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (01) : 271 - 283
  • [50] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107