The Savannah River Site (SRS) spring-operated relief valve (SORV) maintenance intervals were evaluated using the American Petroleum Institute's (API) inspection updating approach in API RP 581 for Risk-Based Inspection (RBI) technology. In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating. Initial Weibull parameter estimates were updated using SRS's historical proof test records contained in the Center for Chemical Process Safety Process Equipment Reliability Database. The API RP 581 methodology was used to estimate the SORV's probability of failing on demand and the annual expected risk. An illustration of the inspection costs versus the associated risks is provided. Current practices are reviewed, and recommendations are made for extending maintenance intervals. A cost-effective maintenance frequency balancing both financial risk and inspection cost is demonstrated. [DOI: 10.1115/1.4005940]
引用
收藏
页数:7
相关论文
共 50 条
  • [21] Risk-Based Strategies for the Next Generation of Maintenance and Inspection Programs
    Conachey, Robert
    Serratella, Christopher M.
    Wang, Ge
    WMU JOURNAL OF MARITIME AFFAIRS, 2008, 7 (01) : 151 - 173
  • [22] Risk-based maintenance and inspection of riverine flood defence systems
    Klerk, Wouter Jan
    van Bergeijk, Vera
    Kanning, Wim
    Wolfert, Rogier
    Kok, Matthijs
    STRUCTURAL SAFETY, 2024, 106
  • [23] Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning
    Khan, FI
    Haddara, MA
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2003, 16 (06) : 561 - 573
  • [24] Risk-based maintenance (RBM): A new approach for process plant inspection and maintenance
    Khan, FI
    Haddara, M
    PROCESS SAFETY PROGRESS, 2004, 23 (04) : 252 - 265
  • [25] AN EXPLORATORY EVALUATION OF A NEW RISK-BASED INSPECTION SCHEME
    Samasoni, Jeff Clement
    Rotimi, James Olabode Bamidele
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 501 - 506
  • [26] A risk-based approach to determination of optimal inspection intervals for buried oil pipelines
    Abubakirov, Rustam
    Yang, Ming
    Khakzad, Nima
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2020, 134 : 95 - 107
  • [27] Risk-based model aids selection of pipeline inspection, maintenance strategies
    Dey, P.K.
    Gupta, S.S.
    Oil and Gas Journal, 2001, 99 (28): : 54 - 60
  • [28] Risk-based model aids selective pipeline inspection maintenance strategies
    Dey, PK
    Gupta, SS
    OIL & GAS JOURNAL, 2001, 99 (28) : 54 - 60
  • [29] Risk-based evaluation of postmortem inspection procedures for pigs in Australia
    Hamilton, DR
    Gallas, P
    Lyall, L
    Lester, S
    McOrist, S
    Hathaway, SC
    Pointon, AM
    VETERINARY RECORD, 2002, 151 (04) : 110 - 116
  • [30] Experience from use of risk-based methods in inspection and maintenance of power plants
    Bareiss, JM
    Jovanovic, AS
    Balos, D
    Perunicic, M
    BALTICA VI: LIFE MANAGEMENT AND MAINTENANCE FOR POWER PLANTS, VOL 1 AND 2, 2004, 233-234 : 31 - 41