共 50 条
- [41] Application of Critical Path in the Construction Engineering Project Management [J]. PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON EDUCATION, SOCIAL SCIENCE, MANAGEMENT AND SPORTS (ICESSMS 2016), 2016, 92 : 88 - 92
- [44] Critical Chain Based on Management of Project Scheduling Risk [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2008, : 1428 - 1431
- [45] Project planning, uncertainty analysis and Critical Chain Management [J]. Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 904 - 909
- [46] Fuzzy-critical-chain-based project management [J]. Journal of the Chinese Institute of Industrial Engineers, 2004, 21 (02): : 167 - 176
- [47] Buffer sizing for the critical chain project management method [J]. SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 19 (01): : 73 - 88
- [48] PROJECT SCHEDULE MANAGEMENT BASED ON CRITICAL CHAIN METHOD [J]. ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 269 - 273
- [49] RESEARCH ON CRITICAL CHAIN MANAGEMENT AND RISK MANAGEMENT IN PROJECT IMPLEMENTATION MANAGEMENT [J]. ICEIS 2011: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 2, 2011, : 351 - 356
- [50] Construction of Tourism Management Mode Based on Project Management Theory [J]. PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING (ESSAEME 2017), 2017, 119 : 1055 - 1059