Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility

被引:6
|
作者
Luchetta, Adriano [1 ]
Manduchi, Gabriele [1 ]
Taliercio, Cesare [1 ]
Soppelsa, Anton [1 ]
Paolucci, Francesco [2 ]
Sartori, Filippo [2 ]
Barbato, Paolo [1 ]
Breda, Mauro [1 ]
Capobianco, Roberto [1 ]
Molon, Federico [1 ]
Moressa, Modesto [1 ]
Polato, Sandro [1 ]
Simionato, Paola [1 ]
Zampiva, Enrico [1 ]
机构
[1] Consorzio RFX, I-35127 Padua, Italy
[2] Fus Energy, Barcelona 08019, Spain
关键词
ITER; neutral beam injector; neutral beam test facility; SYSTEM;
D O I
10.1109/TNS.2013.2281264
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The ITER Neutral Beam Test Facility will be the project's R&D facility for heating neutral beam injectors (HNB) for fusion research operating with H/D negative ions. Its mission is to develop technology to build the HNB prototype injector meeting the stringent HNB requirements (16.5 MW injection power, -1 MeV acceleration energy, 40 A ion current and one hour continuous operation). Two test-beds will be built in sequence in the facility: first SPIDER, the ion source test-bed, to optimize the negative ion source performance, second MITICA, the actual prototype injector, to optimize ion beam acceleration and neutralization. The SPIDER control and data acquisition system is under design. To validate the main architectural choices, a system prototype has been assembled and performance tests have been executed to assess the prototype's capability to meet the control and data acquisition system requirements. The prototype is based on open-source software frameworks running under Linux. EPICS is the slow control engine, MDSplus is the data handler and MARTe is the fast control manager. The prototype addresses low and high-frequency data acquisition, 10 kS/s and 10 MS/s respectively, camera image acquisition, data archiving, data streaming, data retrieval and visualization, real time fast control with 100 control cycle and supervisory control. The paper shows how the proposed prototype architecture can address the most critical requirements of SPIDER control.
引用
收藏
页码:3454 / 3460
页数:7
相关论文
共 50 条
  • [41] TFTR NEUTRAL BEAM CONTROL AND DATA ACQUISITION SYSTEM.
    Lagin, Lawrence
    McEnerney, J.
    Arnold, N.
    Chu, J.
    Cropper, M.
    Davis, S.
    Dong, J.
    Drucker, L.
    Feng, H.
    Fleming, G.
    Grisham, L.
    Johnson, G.
    Kamperschroer, J.
    Kolinchak, G.
    Kugel, H.
    IEEE Transactions on Nuclear Science, 1987, NS-34 (04) : 772 - 774
  • [42] DATA ACQUISITION AND CONTROL INSTRUMENTATION OF THE BEWAG BATTERY TEST FACILITY
    AUST, KD
    KRAMER, KG
    JOURNAL OF POWER SOURCES, 1986, 17 (1-3) : 201 - 202
  • [43] Power Distribution for the SPIDER and MITICA Experiments at the ITER Neutral Beam Test Facility: A System Description and Analyses
    Bigi, M.
    Lazzaro, G.
    Maistrello, A.
    De Lorenzi, A.
    2017 1ST IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2017 17TH IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2017,
  • [44] Neutronic analysis of ITER neutral beam test bed
    Loughlin, MJ
    FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 461 - 465
  • [45] Data acquisition and control system for steady state neutral beam injector
    Patel, GB
    Sharma, V
    Baruah, UK
    Patel, PJ
    Jayakumar, PK
    Jana, MR
    Bisai, N
    Singh, NP
    Chakraborty, AK
    Bandyopadhyay, M
    Chakrapani, C
    Prahlad, V
    Rao, NVM
    Rotti, C
    Shah, S
    Rambabu, S
    Sreedhar, V
    Mattoo, SK
    FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 481 - 486
  • [46] COMPUTER CONTROL AND DATA-ACQUISITION SYSTEM FOR THE RF TEST FACILITY
    STEWART, KA
    BURRIS, RD
    MANKIN, JB
    THOMPSON, DH
    REVIEW OF SCIENTIFIC INSTRUMENTS, 1986, 57 (08): : 1904 - 1906
  • [47] Cryosorption pumps for a neutral beam injector test facility
    Dremel, M.
    Mack, A.
    Day, C.
    Jensen, H.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 51A AND B, 2006, 823 : 583 - +
  • [48] NEUTRAL BEAM TEST FACILITY AT BROOKHAVEN NATIONAL LABORATORY
    MCKENZIEWILSON, RB
    VELIGDAN, JT
    ACQUISITION, TRACKING, AND POINTING III, 1989, 1111 : 160 - 169
  • [49] Progress in the realization of the PRIMA neutral beam test facility
    Toigo, V.
    Boilson, D.
    Bonicelli, T.
    Piovan, R.
    Hanada, M.
    Chakraborty, A.
    Agarici, G.
    Antoni, V.
    Baruah, U.
    Bigi, M.
    Chitarin, G.
    Dal Bello, S.
    Decamps, H.
    Graceffa, J.
    Kashiwagi, M.
    Hemsworth, R.
    Luchetta, A.
    Marcuzzi, D.
    Masiello, A.
    Paolucci, F.
    Pasqualotto, R.
    Patel, H.
    Pomaro, N.
    Rotti, C.
    Serianni, G.
    Simon, M.
    Singh, M.
    Singh, N. P.
    Svensson, L.
    Tobari, H.
    Watanabe, K.
    Zaccaria, P.
    Agostinetti, P.
    Agostini, M.
    Andreani, R.
    Aprile, D.
    Bandyopadhyay, M.
    Barbisan, M.
    Battistella, M.
    Bettini, P.
    Blatchford, P.
    Boldrin, M.
    Bonomo, F.
    Bragulat, E.
    Brombin, M.
    Cavenago, M.
    Chuilon, B.
    Coniglio, A.
    Croci, G.
    Dalla Palma, M.
    NUCLEAR FUSION, 2015, 55 (08)
  • [50] Prediction of neutron source, tritium production and activation for long-pulse operation of the ITER neutral beam test facility
    Jones, TTC
    Cox, SJ
    Emmanoulidis, A
    Loughlin, MJ
    NUCLEAR FUSION, 2006, 46 (06) : S352 - S359