A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry

被引:66
|
作者
Jiang, Shenglong [1 ]
Liu, Min [1 ]
Hao, Jinghua [1 ]
Qian, Wangping [2 ]
机构
[1] Tsinghua Univ, Dept Automat, Beijing 100084, Peoples R China
[2] Jiangsu Shagang Grp Co Ltd, Ctr Comp Applicat, Zhangjiagang 215625, Peoples R China
基金
中国国家自然科学基金;
关键词
Steelmaking; Hybrid flow shop; Scheduling; DE; VNDS; CONTINUOUS-CASTING PRODUCTION; DIFFERENTIAL EVOLUTION ALGORITHM; OF-THE-ART; PROGRAMMING MODEL; TOTAL TARDINESS; MINIMIZE; MACHINE; SYSTEM; EARLINESS;
D O I
10.1016/j.cie.2015.06.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A steelmaking-continuous casting (SCC) scheduling problem is an example of complex hybrid flow shop scheduling problem (HFSSP) with a strong industrial background. This paper investigates the SCC scheduling problem that involves controllable processing times (CPT) with multiple objectives concerning the total waiting time, earliness/tardiness and adjusting cost. The SCC scheduling problem with CPT is seldom discussed in the existing literature. This study is motivated by the practical situation of a large integrated steel company in which the just-in-time am and cost-cutting production strategy have become a significant concern. To address this complex HFSSP, the scheduling problem is decomposed into two subproblems: a parallel machine scheduling problem (PMSP) in the last stage and an HFSSP in the upstream stages. First, a hybrid differential evolution (HDE) algorithm combined with a variable neighborhood decomposition search (VNDS) is proposed for the former subproblem. Second, an iterative backward list scheduling (IBLS) algorithm is presented to solve the latter subproblem. The effectiveness of this bi-layer optimization approach is verified by computational experiments on well-designed and real-world scheduling instances. This study provides a new perspective on modeling and solving practical SCC scheduling problems. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:518 / 531
页数:14
相关论文
共 50 条
  • [31] A bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach
    M. H. Fazel Zarandi
    Vahid Kayvanfar
    The International Journal of Advanced Manufacturing Technology, 2015, 77 : 545 - 563
  • [32] A permutation flow-shop scheduling problem with convex models of operation processing times
    T.C.E. Cheng
    A. Janiak
    Annals of Operations Research, 2000, 96 : 39 - 60
  • [33] A permutation flow-shop scheduling problem with convex models of operation processing times
    Cheng, TCE
    Janiak, A
    ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) : 39 - 60
  • [34] An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem
    Liao, Ching-Jong
    Tjandradjaja, Evi
    Chung, Tsui-Ping
    APPLIED SOFT COMPUTING, 2012, 12 (06) : 1755 - 1764
  • [35] An estimation of distribution algorithm for hybrid flow shop scheduling under stochastic processing times
    Wang, K.
    Choi, S. H.
    Qin, H.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (24) : 7360 - 7376
  • [36] Hybrid particle swarm optimization for flow shop scheduling with stochastic processing time
    Liu, B
    Wang, L
    Jin, YH
    COMPUTATIONAL INTELLIGENCE AND SECURITY, PT 1, PROCEEDINGS, 2005, 3801 : 630 - 637
  • [37] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    Mathematical Problems in Engineering, 2022, 2022
  • [38] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [39] An effective multi-objective discrete virus optimization algorithm for flexible job-shop scheduling problem with controllable processing times
    Lu, Chao
    Li, Xinyu
    Gao, Liang
    Liao, Wei
    Yi, Jin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 104 : 156 - 174
  • [40] Green Hybrid Flow Shop Scheduling Problem Considering Sequence Dependent Setup Times and Transportation Times
    Wu, Shaoxing
    Liu, Li
    IEEE ACCESS, 2023, 11 : 39726 - 39737