Green Hybrid Flow Shop Scheduling Problem Considering Sequence Dependent Setup Times and Transportation Times

被引:0
|
作者
Wu, Shaoxing [1 ]
Liu, Li [2 ]
机构
[1] Nanyang Inst Technol, Informat Construction & Management Ctr, Nanyang 473004, Henan, Peoples R China
[2] Nanyang Inst Technol, Sch Digital Media & Art Design, Nanyang 473004, Henan, Peoples R China
关键词
Energy consumption; Job shop scheduling; Transportation; Scheduling; Mathematical models; Optimization; Parallel machines; Hybrid flow shop; sequence dependent setup times; INDEX TREMS; memetic algorithm; green scheduling; OPTIMIZATION ALGORITHM; MULTIOBJECTIVE OPTIMIZATION; ENERGY;
D O I
10.1109/ACCESS.2023.3269293
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
For the green hybrid flow shop scheduling problem considering sequence dependent setup times (SDST) and transportation times, a mixed integer programming model is established with the objectives of minimizing the maximum completion time (makespan) and total energy consumption simultaneously, and an improved memetic algorithm is proposed with the problem characteristics. First of all, an encoding method combining the jobs sequence code at the first stage with the machine allocation code is designed to ensure that the algorithm can search the entire solution space to the greatest extent; then, a mixed population initialization method is designed to improve the quality of the initial population solution; thirdly, the crossover and mutation operators, and four neighborhood search strategies are designed to balance the global search and local search capabilities of the algorithm; finally, the effectiveness of the algorithm is verified by numerical experiments.
引用
收藏
页码:39726 / 39737
页数:12
相关论文
共 50 条
  • [1] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    [J]. Mathematical Problems in Engineering, 2022, 2022
  • [2] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [3] HYBRID GENETIC ALGORITHM FOR ASSEMBLY FLOW-SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP AND TRANSPORTATION TIMES
    Dalfard, Vahid Majazi
    Ardakani, Allahyar
    Banihashemi, Tak Nazalsadat
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (04): : 497 - 504
  • [4] Hybrid Flow Shop with Setup Times Scheduling Problem
    Jemmali, Mahdi
    Hidri, Lotfi
    [J]. COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2023, 44 (01): : 563 - 577
  • [5] Modeling and optimization of the hybrid flow shop scheduling problem with sequence-dependent setup times
    Xue, Huiting
    Meng, Leilei
    Duan, Peng
    Zhang, Biao
    Zou, Wenqiang
    Sang, Hongyan
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (02) : 473 - 490
  • [6] Job-shop scheduling problem with sequence dependent setup times
    Moghaddas, R.
    Houshmand, M.
    [J]. IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1546 - 1552
  • [7] A hybrid genetic algorithm for the hybrid flow shop scheduling problem with machine blocking and sequence-dependent setup times
    Ferreira Maciel, Ingrid Simoes
    Prata, Bruno de Athayde
    Nagano, Marcelo Seido
    de Abreu, Levi Ribeiro
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2022, : 201 - 216
  • [8] An immune algorithm for hybrid flow shop scheduling problem with time lags and sequence-dependent setup times
    Javadian, Nikbakhsh
    Fattahi, Parviz
    Farahmand-Mehr, Mohammad
    Amiri-Aref, Mehdi
    Kazemi, Mohammad
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 63 (1-4): : 337 - 348
  • [9] An immune algorithm for hybrid flow shop scheduling problem with time lags and sequence-dependent setup times
    Nikbakhsh Javadian
    Parviz Fattahi
    Mohammad Farahmand-Mehr
    Mehdi Amiri-Aref
    Mohammad Kazemi
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 63 : 337 - 348
  • [10] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    [J]. JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370