Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong

被引:49
|
作者
Huo, Tengfei [1 ]
Ren, Hong [1 ]
Cai, Weiguang [1 ]
Shen, Geoffrey Qiping [2 ]
Liu, Bingsheng [3 ]
Zhu, Minglei [1 ]
Wu, Hengqin [3 ]
机构
[1] Chongqing Univ, Sch Construct Management & Real Estate, Chongqing 400044, Peoples R China
[2] Tianjin Univ, Sch Management & Econ, Tianjin 300072, Peoples R China
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon 999077, Hong Kong, Peoples R China
关键词
Cost overruns; Megainfrastructure projects; Characteristics; Dependence analysis; Hong Kong; PUBLIC-WORKS PROJECTS; CONSTRUCTION PROJECTS; BID EVALUATION; DECISION; PERFORMANCE; ESCALATION; DELAYS;
D O I
10.1061/(ASCE)CO.1943-7862.0001444
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates the characteristics of the cost performance of megatransport infrastructure projects in Hong Kong and performs dependence analysis of cost overruns. It is based on 57 samples of road, rail, bridge, and tunnel projects over the period of 1985-2015 and pursues the following two objectives: (1)it measures the characteristics of cost overruns in Hong Kong megatransport infrastructure projects using case data and statistical analysis method; and (2)it examines three independent explanatory variables (i.e.,project type, size of the project, and length of the project implementation period) and their statistical relationship with cost overruns to determine whether there exist differences between Hong Kong infrastructure projects and the worldwide findings. The results indicate that, in Hong Kong, projects on average have a cost escalation of 39.18% and the average cost overrun is 34.83% for rail, 32.52% for road projects, and 37.48% for fixed-link (i.e.,bridges and tunnels) projects. The year of the decision to build has no effect on cost escalation. The major findings concerning the dependence of cost escalations are as follows. In terms of project type, rail projects are most prone to cost increase, followed by fixed-links, whereas road projects are the least vulnerable to cost escalations. Cost overruns have no significant relationship with project size, but for road projects, smaller scale projects tend to be more prone to larger cost overruns. The cost overruns strongly depend on the length of the implementation phase; cost escalations increase 1.35% with each additional year of preconstruction period. This indicates that the preconstruction phase length can be viewed as a better indicator of cost escalations compared to the construction length. This can be an essential contribution to the existing literature on cost overruns as the stage in which the infrastructures are most prone to cost escalations is considerably narrowed down. The practical implications of this study are that decision makers should focus on this period and pay more attention to delays and longer preconstruction phases if they want to determine the causes and solutions of cost overruns. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Cost overruns and delays in infrastructure projects: the case of Stuttgart 21
    Steininger, Bertram, I
    Groth, Martin
    Weber, Brigitte L.
    JOURNAL OF PROPERTY INVESTMENT & FINANCE, 2021, 39 (03) : 256 - 282
  • [2] Study on Time and Cost Overruns in Mega Infrastructure Projects in India
    Narayanan S.
    Kure A.M.
    Palaniappan S.
    Journal of The Institution of Engineers (India): Series A, 2019, 100 (01) : 139 - 145
  • [3] Persisting Cost Overruns in Public Infrastructure Projects: Lessons From the Belgian Case
    Molinari, Laura
    Haezendonck, Elvira
    Van Rompay, Katrien
    Mabillard, Vincent
    Dooms, Michael
    PUBLIC WORKS MANAGEMENT & POLICY, 2025, 30 (01) : 36 - 57
  • [4] Different cost performance: different determinants? The case of cost overruns in Dutch transport infrastructure projects
    Cantarelli, C. C.
    van Wee, B.
    Molin, E. J. E.
    Flyvbjerg, B.
    TRANSPORT POLICY, 2012, 22 : 88 - 95
  • [5] Exogenous determinants of cost deviations and overruns in local infrastructure projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2019, 37 (12) : 697 - 711
  • [6] THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA
    Andric, Jelena M.
    Mahamadu, Abdul-Majeed
    Wang, Jiayuan
    Zou, Patrick X. W.
    Zhong, Ruoyu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) : 203 - 214
  • [7] Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations
    Lind, Hans
    Brunes, Fredrik
    CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (03): : 74 - 85
  • [8] How common and how large are cost overruns in transport infrastructure projects?
    Flyvbjerg, B
    Holm, MKS
    Buhl, SL
    TRANSPORT REVIEWS, 2003, 23 (01) : 71 - 88
  • [9] Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden
    Lind, Hans
    Brunes, Fredrik
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (07) : 554 - 568