Extended optimal preventive replacement policies with random working cycle

被引:38
|
作者
Shey-Huei, Sheu [1 ,2 ,3 ]
Tzu-Hsin, Liu [1 ]
Zhe-George, Zhang [4 ,5 ,6 ]
机构
[1] Asia Univ, Dept Business Adm, Taichung 413, Taiwan
[2] China Med Univ, China Med Univ Hosp, Dept Med Res, Taichung 404, Taiwan
[3] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
[4] Sichuan Univ, Sch Business, Chengdu 610064, Sichuan, Peoples R China
[5] Western Washington Univ, Dept Decis Sci, Bellingham, WA 98225 USA
[6] Simon Fraser Univ, Beedie Sch Business, Burnaby, BC V5A 1S6, Canada
关键词
Minimal repair; Optimization; Preventive replacement first; Preventive replacement last; Random working time; CUMULATIVE DAMAGE MODELS; MINIMAL REPAIR COSTS; SYSTEM SUBJECT; MAINTENANCE POLICIES; OPTIMAL NUMBER; PERIODIC REPLACEMENT; GENERALIZED AGE; LAST; 1ST;
D O I
10.1016/j.ress.2019.03.036
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates the preventive replacement policies for an operating system that works for projects at random times. The system is subject to shocks which arrive according to a non-homogeneous Poisson process. When a shock takes place, the system is either replaced by a new one (type 2 failure) or minimally repaired (type 1 failure). The decision to repair or replace the system depends on the number of shocks that have occurred since the last replacement. In this paper, we propose the following two preventive replacement models: (1) the system is preventively replaced before a type 2 failure at age T or at the completion of the Nth working projects or at the kth type 1 failure, whichever occurs last; (2) the system is preventively replaced before a type 2 failure at age T or at the completion of the Nth working projects or at the kth type 1 failure, whichever occurs first. For each model, the optimum preventive replacement schedule that minimizes the long term expected cost per unit time is theoretically presented. Finally, we offer a computational algorithm for determining the optimum replacement policies, and we give a numerical example to illustrate our proposed models. This study provides a general framework such that many existing models are the special cases of the proposed models.
引用
收藏
页码:398 / 415
页数:18
相关论文
共 50 条
  • [41] OPTIMAL CONTINUOUS POLICIES FOR REPAIR AND REPLACEMENT
    DIVEROLI, JC
    OPERATIONAL RESEARCH QUARTERLY, 1974, 25 (01) : 89 - 97
  • [42] ADAPTIVE WINDOW WORKING SET REPLACEMENT POLICIES
    VANWEZENBEEK, AM
    WITHAGEN, WJ
    MICROPROCESSING AND MICROPROGRAMMING, 1992, 34 (1-5): : 53 - 56
  • [43] Cost optimal preventive maintenance and replacement scheduling
    Usher, JS
    Kamal, AH
    Syed, WH
    IIE TRANSACTIONS, 1998, 30 (12) : 1121 - 1128
  • [44] Cost optimal preventive maintenance and replacement scheduling
    Department of Industrial Engineering, Department of Engineering Mathematics and Computer Science, University of Louisville, Louisville, KY 40292, United States
    IIE Trans, 12 (1121-1128):
  • [45] Preventive replacement policies for parallel systems with deviation costs between replacement and failure
    Zhao, Xufeng
    Mizutani, Satoshi
    Chen, Mingchih
    Nakagawa, Toshio
    ANNALS OF OPERATIONS RESEARCH, 2022, 312 (01) : 533 - 551
  • [46] Preventive replacement policies for parallel systems with deviation costs between replacement and failure
    Xufeng Zhao
    Satoshi Mizutani
    Mingchih Chen
    Toshio Nakagawa
    Annals of Operations Research, 2022, 312 : 533 - 551
  • [47] Optimal dividend policies with random profitability
    Reppen, A. Max
    Rochet, Jean-Charles
    Soner, H. Mete
    MATHEMATICAL FINANCE, 2020, 30 (01) : 228 - 259
  • [48] Optimal random and periodic inspection policies
    Sugiura, T
    Mizutani, S
    Nakagawa, T
    NINTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN, 2003 PROCEEDINGS, 2003, : 42 - 45
  • [49] REPLACEMENT POLICIES FOR A UNIT WITH RANDOM AND WEAROUT FAILURES
    NAKAGAWA, T
    IEEE TRANSACTIONS ON RELIABILITY, 1980, 29 (04) : 342 - 344
  • [50] Random Replacement Policies for Two Failure Modes
    Mizutani, Satoshi
    Zhao, Xufeng
    Nakagawa, Toshio
    2020 ASIA-PACIFIC INTERNATIONAL SYMPOSIUM ON ADVANCED RELIABILITY AND MAINTENANCE MODELING (APARM), 2020,