Evaluation and selection of construction projects based on risk analysis

被引:17
|
作者
Issa, Usama H. [1 ,2 ]
Mosaad, Salah A. A. [3 ,4 ]
Hassan, M. Salah [4 ]
机构
[1] Taif Univ, Coll Engn, Dept Civil Engn, At Taif, Saudi Arabia
[2] Minia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Minia Univ, Fac Engn, Dept Mech Power & Energy, Al Minya, Egypt
关键词
Risk analysis; Decisions; Contractor; AHP; Construction projects; HVAC; Fuzzy; DECISION-MAKING; MODEL; DELIVERY; SYSTEMS; AHP;
D O I
10.1016/j.istruc.2020.05.049
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The project selection problem has attracted significant attention among construction project participants. Typically, a contractor can execute one or more projects from available projects. This study introduces a new strategy to help contractors in evaluating and selecting suitable construction projects. The new strategy is based on identifying multiple criteria that affect construction projects as well as developing and using a model that supports decision based on the analytic hierarchy process. Furthermore, a fuzzy risk analysis model is proposed to analyze and quantify some of the identified criteria to help contractors select minimally risky projects. Market conditions, financial resources, project conditions, time delays, and cost overruns are five identified criteria that control the selection. Through identifying 70 subsidiary factors, the effects and importance of the first three criteria were determined through a field survey, while time delay and cost overrun criteria were analyzed and quantified through the risk analysis model. The new strategy was applied on a real case study comprising two HVAC system projects in the construction industry (project 1 in Egypt and project 2 in Saudi Arabia). Criteria and causes that yield different effects on the new strategy to support contractor decision and selection control are discussed in detail. Risk factors were ranked according to their importance, and their effects on both time and cost were clarified. The results obtained from the investigated case study showed 55.5% support for project 2, and only 44.5% support for project 1. This strategy is applicable to other case studies in different countries with different projects, criteria, and execution activities.
引用
收藏
页码:361 / 370
页数:10
相关论文
共 50 条
  • [31] Risk analysis on construction of agricultural water conservancy projects
    Wei M.
    Lu S.
    Zheng Z.
    Nongye Gongcheng Xuebao/Transactions of the Chinese Society of Agricultural Engineering, 2011, 27 (SUPPL. 1): : 233 - 237
  • [32] A Scientometric Analysis of Studies on Risk Management in Construction Projects
    Osei-Kyei, Robert
    Narbaev, Timur
    Ampratwum, Godslove
    BUILDINGS, 2022, 12 (09)
  • [33] Research on risk analysis and countermeasures in international construction projects
    Xu, CJ
    Zhang, H
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 215 - 217
  • [34] Judgmental risk analysis process development in construction projects
    Öztas, A
    Ökmen, Ö
    BUILDING AND ENVIRONMENT, 2005, 40 (09) : 1244 - 1254
  • [35] Big Data Analysis for Risk Management in Construction Projects
    Gorecki, Jaroslaw
    INNOVATION MANAGEMENT AND EDUCATION EXCELLENCE THROUGH VISION 2020, VOLS I -XI, 2018, : 2712 - 2721
  • [36] Evaluation of environmental risk on urban construction projects : Case study
    Ren, Xuehui
    Zheng, Haixia
    Xia, Lin
    Zhang, Haijing
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 702 - 704
  • [37] Design risk modeling and analysis for railway construction projects
    Gashaw, Tesfaye
    Jilcha, Kassu
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (14) : 2488 - 2498
  • [38] Construction Projects Risk Assessment based on Fuzzy AHP
    Gohar, A. Sotoodeh
    Khanzadi, M.
    Jalal, M. Parchami
    Javid, A. A. Shirzadi
    2009 IEEE STUDENT CONFERENCE ON RESEARCH AND DEVELOPMENT: SCORED 2009, PROCEEDINGS, 2009, : 570 - 573
  • [39] Methodology and tools for risk evaluation in construction projects using Risk Breakdown Structure
    Rasool, Mehdizadeh
    Franck, Taillandier
    Denys, Breysse
    Halidou, Niandou
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2012, 16 : S78 - S98
  • [40] The Evaluation of the Contractor's Risk in Implementing the Investment Projects in Construction by Using the Verbal Analysis Methods
    Shevchenko, Galina
    Ustinovichius, Leonas
    Walasek, Dariusz
    SUSTAINABILITY, 2019, 11 (09)