Evaluation and selection of construction projects based on risk analysis

被引:17
|
作者
Issa, Usama H. [1 ,2 ]
Mosaad, Salah A. A. [3 ,4 ]
Hassan, M. Salah [4 ]
机构
[1] Taif Univ, Coll Engn, Dept Civil Engn, At Taif, Saudi Arabia
[2] Minia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Minia Univ, Fac Engn, Dept Mech Power & Energy, Al Minya, Egypt
关键词
Risk analysis; Decisions; Contractor; AHP; Construction projects; HVAC; Fuzzy; DECISION-MAKING; MODEL; DELIVERY; SYSTEMS; AHP;
D O I
10.1016/j.istruc.2020.05.049
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The project selection problem has attracted significant attention among construction project participants. Typically, a contractor can execute one or more projects from available projects. This study introduces a new strategy to help contractors in evaluating and selecting suitable construction projects. The new strategy is based on identifying multiple criteria that affect construction projects as well as developing and using a model that supports decision based on the analytic hierarchy process. Furthermore, a fuzzy risk analysis model is proposed to analyze and quantify some of the identified criteria to help contractors select minimally risky projects. Market conditions, financial resources, project conditions, time delays, and cost overruns are five identified criteria that control the selection. Through identifying 70 subsidiary factors, the effects and importance of the first three criteria were determined through a field survey, while time delay and cost overrun criteria were analyzed and quantified through the risk analysis model. The new strategy was applied on a real case study comprising two HVAC system projects in the construction industry (project 1 in Egypt and project 2 in Saudi Arabia). Criteria and causes that yield different effects on the new strategy to support contractor decision and selection control are discussed in detail. Risk factors were ranked according to their importance, and their effects on both time and cost were clarified. The results obtained from the investigated case study showed 55.5% support for project 2, and only 44.5% support for project 1. This strategy is applicable to other case studies in different countries with different projects, criteria, and execution activities.
引用
收藏
页码:361 / 370
页数:10
相关论文
共 50 条
  • [21] A DECISION ANALYSIS FRAMEWORK FOR VENDOR SELECTION IN CONSTRUCTION PROJECTS IN GREECE
    Manoliadis, Odysseus
    Tsolas, Ioannis E.
    JOURNAL OF PUBLIC PROCUREMENT, 2009, 9 (02) : 248 - +
  • [22] RISK ASSESSMENT THROUGH CONSTRUCTION SEQUENCE ANALYSIS FOR PLANT CONSTRUCTION PROJECTS
    Kim, Jihye
    Choi, Jaehyun
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 495 - 500
  • [23] Performance Analysis of Construction Manager at Risk on Pipeline Engineering and Construction Projects
    Francom, Tober
    El Asmar, Mounir
    Ariaratnam, Samuel T.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (06)
  • [24] AHP-based equipment selection model for construction projects
    Shapira, A
    Goldenberg, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (12): : 1263 - 1273
  • [25] Fuzzy Comprehensive Evaluation on the Projects Risk Based Set Pair Analysis
    Li, Gaoyang
    MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 1221 - 1225
  • [26] Risk management in construction projects, selected methods for the evaluation of risks
    Schieg, Martin
    9TH INTERNATIONAL CONFERENCE: MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, VOLS 1-3, 2008, : 371 - 374
  • [27] Analysis of fraud risk in public construction projects in China
    Deng, Xiaomei
    Wang, Yuhong
    Zhang, Qianqian
    Huang, Judy Xiye
    Cui, Jingjing
    PUBLIC MONEY & MANAGEMENT, 2014, 34 (01) : 51 - 58
  • [28] An Evaluation of Risk Impacting Highway and Road Construction Projects in Nigeria
    Chileshe, Nicholas
    Awotunde, Gabriel Babajide
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 336 - 344
  • [29] Risk Analysis of University New Campus Construction Projects
    Yang Jianping
    Zhou Lin
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, 2010, : 314 - 320
  • [30] A New Approach to Analysis of Green Risk in Construction Projects
    Zhang, Xian-feng
    Li, Hui-qiang
    He, Yong-fang
    Liu, Hai-liang
    EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2248 - 2253