Research on PMC Project Organization Model Based on Concurrent Engineering

被引:0
|
作者
Li Qianjin [1 ]
Wang Gang [2 ]
Yang Weibo [3 ]
机构
[1] Shijiazhuang Railway Inst, Sch Econ & Management, Shijiazhuang 050043, Peoples R China
[2] Shijiazhuang Railway Inst, Shijiazhuang 050043, Peoples R China
[3] China Railway Seventh Grp Co LTD, Oversea Co, Zhengzhou 450016, Peoples R China
关键词
PMC; Concurrent Engineering; Project Management;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Modem projects are characterized by their large sizes and multi-investment, and project management is becoming increasingly complicated and more difficult. Without advanced and practical management models, it would be impossible to construct projects with good functions at low investments. Construction project integration management is all effectual method to resolve the weakness of the traditional management model. the strong point of PMC is analyzed in the point of integration management. The organization structure and its main characteristics of project PMC model in accordance with concurrent engineering are introduced and also the new cooperation relationship between each members of project is illustrated in this paper. In order to improve the comprehensive economic benefits of the engineering project, this paper presents project information portal (PIP) information communication method used in PMC project, and puts forward integrated project team constituted in project.
引用
收藏
页码:155 / +
页数:2
相关论文
共 50 条
  • [1] A project task coordination model for team organization in concurrent engineering
    Chen, SJ
    Lin, L
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2002, 10 (03): : 187 - 202
  • [2] Research on applying concurrent engineering to real estate project management
    Yang Xiaolin
    [J]. PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 549 - 551
  • [3] An integrated methodological framework for project task coordination and team organization in concurrent engineering
    Chen, Shi-Jie
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2005, 13 (03): : 185 - 197
  • [4] Concurrent Engineering Based Vehicle Development Project Management
    Li Yubing
    [J]. MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 2829 - 2834
  • [5] Concurrent engineering diagnostic model integrating people, organization and technology
    Duffy, VG
    Salvendy, G
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (05) : 461 - 474
  • [6] A hypermedia based model for concurrent engineering
    Biennier, F
    Coquard, P
    Favrel, J
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1995, 3 (01): : 3 - 11
  • [7] Concurrent Software Engineering Project
    Stankovic, Nenad
    Tillo, Tammam
    [J]. JOURNAL OF INFORMATION TECHNOLOGY EDUCATION-INNOVATIONS IN PRACTICE, 2009, 8 : 27 - 41
  • [8] Research on CAPP system based on concurrent engineering
    Liu, Yanbin
    Ding, Xin
    Chen, Xun
    [J]. WMSCI 2006: 10TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL VII, PROCEEDINGS, 2006, : 326 - +
  • [9] Opportunity analysis of intelligent project based organization business model for Moroccan project based organizations Application to engineering sector
    Alami Marrouni, Oussama
    Bouksour, Othmane
    Beidouri, Zitouni
    [J]. 2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2013, : 951 - 959
  • [10] Research on the Risk Assessment of Railway Engineering Project Based on FAHP Model
    Li, Suying
    Tian, Ya
    Wu, Yongli
    [J]. Journal of Railway Engineering Society, 2019, 36 (07) : 92 - 99