Study on the construction progress plan in Urumqi

被引:0
|
作者
Wang, Jiading [1 ]
机构
[1] Vocat & Tech Coll Xinjiang Construct, Dept City Construct, Urumqi 830026, Peoples R China
关键词
construction; progress; plan; winter; Urumqi;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
It is hard for the starting and ending date of winter construction to be ensured. Since the periods change every year. A number of construction enterprises ignore its danger without taking winter construction measures during periods so that building project accidents often occur. So, how to confirm scientifically the dates is vital. Analysis shows that the starting and ending dates of winter construction are stochastic variables according to the probability theory and it appears Gaussian distribution. The paper attained meteorological data from Urumqi Weather Bureau to calculate the starting and ending date of high guarantee ratio in winter in Urumqi by establishing mathematical model. The paper proposes Oct 11 as starting date and April 14 as ending date of winter construction in Urumqi, because the guarantee ratio of the two dates both are 95%.
引用
收藏
页码:1748 / 1752
页数:5
相关论文
共 50 条
  • [31] Appropriations plan hits construction
    ENR (Engineering News-Record), 1994, 233 (01):
  • [32] The silk road economic belt - Urumqi construction for regional financial center analysis
    Liang, Yanhui
    Li, Guodong
    2017 INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE 2017), 2017, : 100 - 103
  • [33] The feasibility study of bridge construction plan in Digoel River Province of Papua
    Setiati, N. R.
    1ST INTERNATIONAL CONFERENCE ON GLOBAL ISSUE FOR INFRASTRUCTURE, ENVIRONMENT & SOCIO-ECONOMIC DEVELOPMENT, 2019, 235
  • [34] ACADEMIC STUDY MOTIVATION - THE CONSTRUCTION OF A PSYCHO-PEDAGOGICAL SUPPORT PLAN
    Oprea, Anca Cristina
    ELEARNING VISION 2020!, VOL II, 2016, : 159 - 166
  • [35] Study of Network-Based Railway Construction Plan Management System
    Qin, Sheng
    Zhou, Leishan
    Yue, Yixiang
    NFD 2010: INTERNATIONAL CONFERENCE ON NETWORK AND FINANCE DEVELOPMENT, 2010, : 328 - 332
  • [36] THE PLAN AND CONSTRUCTION OF THE CIRCUS OF MAXENTIUS
    MACDONALD, W
    AMERICAN JOURNAL OF ARCHAEOLOGY, 1958, 62 (02) : 224 - 224
  • [37] On construction plan management of shiplock
    Wang, H.
    Renmin Changjiang/Yangtze River, 2001, 32 (08): : 50 - 52
  • [38] A Study on the Changes and Development of Water Resources in Urumqi
    Wang, Zhi-Jian
    Dang, Fei
    CHINA FUNCTIONAL MATERIALS TECHNOLOGY AND INDUSTRY FORUM, 2013, 320 : 748 - 752
  • [39] CONSTRUCTION OF AN OPTIMAL ECONOMIC PLAN
    DUBOVSKII, SV
    DYUKALOV, AN
    IVANOV, YN
    TOKAREV, VV
    UZDEMIR, AP
    FATKIN, YM
    AUTOMATION AND REMOTE CONTROL, 1972, 33 (08) : 1336 - 1349
  • [40] CONSTRUCTION PLAN - TECHNICAL ADVICE
    HORNUNG, HH
    FLEISCHWIRTSCHAFT, 1979, 59 (02): : 203 - 203