Study on the construction progress plan in Urumqi

被引:0
|
作者
Wang, Jiading [1 ]
机构
[1] Vocat & Tech Coll Xinjiang Construct, Dept City Construct, Urumqi 830026, Peoples R China
关键词
construction; progress; plan; winter; Urumqi;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
It is hard for the starting and ending date of winter construction to be ensured. Since the periods change every year. A number of construction enterprises ignore its danger without taking winter construction measures during periods so that building project accidents often occur. So, how to confirm scientifically the dates is vital. Analysis shows that the starting and ending dates of winter construction are stochastic variables according to the probability theory and it appears Gaussian distribution. The paper attained meteorological data from Urumqi Weather Bureau to calculate the starting and ending date of high guarantee ratio in winter in Urumqi by establishing mathematical model. The paper proposes Oct 11 as starting date and April 14 as ending date of winter construction in Urumqi, because the guarantee ratio of the two dates both are 95%.
引用
收藏
页码:1748 / 1752
页数:5
相关论文
共 50 条
  • [21] CONSTRUCTION PROGRESS
    MACPHAIL, A
    NUCLEAR ENGINEERING INTERNATIONAL, 1977, 22 (258): : 53 - 56
  • [22] Construction in Progress ...
    Heinemann, M. K.
    THORACIC AND CARDIOVASCULAR SURGEON, 2012, 60 (04): : 245 - 246
  • [23] MARYLAND PLAN FOR PROGRESS IN TRANSPORTATION
    ADDISON, WJ
    TRAFFIC QUARTERLY, 1964, 18 (02): : 265 - 274
  • [24] REACTIONS TO THE DUAL PROGRESS PLAN
    FLEMING, RS
    HURLEY, B
    KELIHER, AV
    MANOLAKES, G
    EDUCATIONAL LEADERSHIP, 1960, 18 (02) : 92 - 95
  • [25] THE ASTORIA PLAN - A DECADE OF PROGRESS
    JACOBZINER, H
    JOURNAL OF PEDIATRICS, 1951, 38 (02): : 221 - 230
  • [26] PROJECT PLAN PROGRESS REPORT
    WRIGHT, CE
    EDUCATION, 1970, 90 (03): : 261 - &
  • [27] Network plan for genome progress
    Williams, N
    CURRENT BIOLOGY, 2004, 14 (20) : R869 - R870
  • [28] The WPA Action Plan is in progress
    Maj, Mario
    WORLD PSYCHIATRY, 2009, 8 (02) : 65 - 66
  • [29] Progress in the study and construction of the TESLA test facility injector
    Chehab, R
    Bernard, M
    Bourdon, JC
    Garvey, T
    Jacquemard, B
    Mencick, M
    Mouton, B
    Omeich, M
    Rodier, J
    Roudier, P
    Saury, JL
    TaurignaQuere, M
    Thiery, Y
    Aune, B
    Desmons, M
    Fusellier, J
    Gougnaud, F
    Gournay, JF
    Jablonka, M
    Joly, JM
    Juillard, M
    Lussignol, Y
    Mosnier, A
    Phung, B
    Buhler, S
    Junquera, T
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 998 - 1000
  • [30] The Study on the Emergency Management Plan in Advance for the Railway Tunnel Construction Project
    Wang, Yahui
    Chen, Youxin
    INTERNATIONAL SYMPOSIUM ON EMERGENCY MANAGEMENT 2009 (ISEM'09), 2009, : 430 - +