Adaptive regulating reserve scheduling for the isolated power system

被引:1
|
作者
Chang-Chien, Le-Ren [1 ]
Chien, Chung-Wei [1 ]
Hu, Tsung-Hao [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Elect Engn, Tainan 70101, Taiwan
来源
关键词
AGC reserve; frequency regulation; spinning reserve; FREQUENCY BIAS; REQUIREMENT;
D O I
10.1002/etep.625
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Regulating reserve is generally deployed to support system frequency. Because the moment-to-moment load fluctuations require continuous frequency control, allocating the reserve for this kind should be flexible to support the function of automatic generation control. Because fast response units not only are assigned to support automatic generation control but also are utilized to deal with credible frequency events, the regulating reserve may be planned as a portion of contingency reserve for security concern, especially for an isolated power system. Without inter-tie to mutually support system frequency, frequency of an isolated system is much more sensitive to the disturbances than that in the interconnection. Therefore, the scheduling of regulating reserve for an isolated system should be more cautious to take both security and economy into account. This paper describes a methodology that adaptively schedules the regulating reserve based on the dynamic security margin as well as the ongoing demand of the system. Compared with the conventional way of using the historical data, the proposed scheduling method is proven to be more capable of dealing with the change of system condition and furthermore potentially reducing the extraneous reserve. More operational cases will be presented to show the merits of the proposed method that is applied to the ancillary service market. Copyright (c) 2011 John Wiley & Sons, Ltd.
引用
收藏
页码:1065 / 1077
页数:13
相关论文
共 50 条
  • [21] Research on adaptive dispatching of power system considering reserve energy storage and cost
    Wang W.
    Wang Z.
    Liu X.
    Li W.
    Li Q.
    Zhang Y.
    Chen Q.
    Guo S.
    Xu Z.
    [J]. Advanced Control for Applications: Engineering and Industrial Systems, 2023, 5 (03):
  • [22] An Expert System for Optimal Scheduling of a Diesel - Wind - Energy Storage Isolated Power System
    Ross, Michael
    Hidalgo, Rodrigo
    Abbey, Chad
    Joos, Geza
    [J]. IECON: 2009 35TH ANNUAL CONFERENCE OF IEEE INDUSTRIAL ELECTRONICS, VOLS 1-6, 2009, : 4080 - +
  • [23] Stochastic reserve scheduling of energy storage system in energy and reserve markets
    Tang, Zao
    Liu, Junyong
    Liu, Youbo
    Xu, Lixiong
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 123
  • [24] Economical generation reserve in isolated power systems
    El-Sayed, MAH
    [J]. ELECTRIC MACHINES AND POWER SYSTEMS, 1998, 26 (09): : 963 - 976
  • [25] Reserve Optimization for Power System Considering Reliability of Wind Power Reserve
    Wang Z.
    Wang M.
    Yang M.
    Wang M.
    Wang C.
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (15): : 142 - 150
  • [26] Self Scheduling of a Virtual Power Plant in Energy and Reserve Electricity Markets: A Stochastic Adaptive Robust Optimization Approach
    Baringo, Ana
    Baringo, Luis
    Arroyo, Jose M.
    [J]. 2018 POWER SYSTEMS COMPUTATION CONFERENCE (PSCC), 2018,
  • [27] Dynamic economic dispatch of wind integrated power system considering optimal scheduling of reserve capacity
    [J]. Luo, Chao, 1600, Chinese Society for Electrical Engineering (34):
  • [28] An Optimal Scheduling Strategy of Spinning Reserve Considering Coordination Between Source and Load for Power System
    Yu, Zhaoguo
    Song, Ziqiu
    Hu, Yang
    Feng, Hanyu
    [J]. 2021 3RD ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM (AEEES 2021), 2021, : 719 - 724
  • [29] Determination of Maximum Wind Power Penetration in an Isolated Island System by Considering Spinning Reserve
    Chang, Chia-An
    Wu, Yuan-Kang
    Chen, Bin-Kwie
    [J]. ENERGIES, 2016, 9 (09)
  • [30] Determination of Maximum Wind Power Penetration in a Isolated Island System by Considering Spinning Reserve
    Chang Chia-An
    Wu Yuan-Kang
    Peng Zhao-Guo
    Chen Bin-Kwie
    [J]. 2014 IEEE/IAS 50TH INDUSTRIAL & COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE (I&CPS), 2014,