共 50 条
- [2] Determination of Maximum Wind Power Penetration Considering Wind Turbine Fast Frequency Response [J]. 2019 IEEE MILAN POWERTECH, 2019,
- [3] Spinning Reserve Planning under Large Wind Power Penetration Considering Carbon Dioxide Fmission [J]. 2012 7TH INTERNATIONAL CONFERENCE ON COMPUTING AND CONVERGENCE TECHNOLOGY (ICCCT2012), 2012, : 1343 - 1348
- [5] Quantifying Spinning Reserve in Systems with Significant Wind Power Penetration [J]. 2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2012,
- [8] The optimal spinning reserve considering wind power prediction deviation [J]. ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 299 - +
- [10] Research on calculation of spinning reserve capacity of wind power system considering multiple uncertainties [J]. 2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632