Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users

被引:56
|
作者
Fernandez-Solis, Jose L. [1 ]
Porwal, Vishal [1 ]
Lavy, Sarel [1 ]
Shafaat, Ali [2 ]
Rybkowski, Zofia K. [1 ]
Son, Kiyoung [3 ]
Lagoo, Nishi [1 ]
机构
[1] Texas A&M Univ, Dept Construct Sci, Coll Architecture, College Stn, TX 77843 USA
[2] Texas A&M Univ, Dept Ind & Syst Engn, Coll Engn, College Stn, TX 77843 USA
[3] Texas A&M Univ, Dept Architecture, Coll Architecture, College Stn, TX 77843 USA
关键词
Percent plan complete (PPC); Last planner system; Five whys; Daily huddle meetings; Six sigma; Reasons charting and constraint analysis; CONSTRUCTION;
D O I
10.1061/(ASCE)CO.1943-7862.0000606
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The number of construction project managers initializing the use of the Last Planner System of Production Control (LPS), an operating system for project management designed to optimize work flow and promote rapid learning, is rapidly increasing, motivated by industry trends and testimonials of its perceived benefits. This study, limited to the building sector, is a systematic literature and testimonial search of the perceived motivations and benefits or challenges for choosing LPS. It substantiates the claims of those perceptions through a structured survey of senior and mid-level managers. Quantitative statistical tools infer that practitioners who use LPS experience more reliable planning, better supply chain integration, and less work flow time. However, managers who directly implement LPS are faced with external resistance from clients and subcontractors, and feel that their organization does not offer the necessary incentives for adopting LPS, indicating a possible clash of paradigms. The case studies and testimonials were available in the literature referenced in the paper, but the survey and the method for analysis are new and have not been published elsewhere, either wholly or in part. DOI: 10.1061/(ASCE)CO.1943-7862.0000606. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:354 / 360
页数:7
相关论文
共 50 条
  • [21] MODULAR IMPLEMENTATION BENEFITS DEVELOPERS, USERS
    POTOSNAK, K
    IEEE SOFTWARE, 1989, 6 (03) : 91 - &
  • [22] Motivations related to the quality management system and benefits of its implementation in the company: state of the art
    Echour, Saida
    Nbigui, Taibi
    LOGISTIQUA2020: 2020 IEEE 13TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA 2020), 2020,
  • [23] Key requirements of an IT tool based on last planner® system
    Cortes, M. J.
    Herrera, R. F.
    Munoz-La Rivera, F. C.
    Avila-Eca de Matos, B.
    REVISTA INGENIERIA DE CONSTRUCCION, 2020, 35 (02): : 126 - 134
  • [24] Development of Innovative Integrated Last Planner System (ILPS)
    Mughees Aslam
    Zhili Gao
    Gary Smith
    International Journal of Civil Engineering, 2020, 18 : 701 - 715
  • [25] Development of Innovative Integrated Last Planner System (ILPS)
    Aslam, Mughees
    Gao, Zhili
    Smith, Gary
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2020, 18 (6A) : 701 - 715
  • [26] Last planner system results in subcontract construction company
    Andrade, M.
    Arrieta, B.
    REVISTA DE LA CONSTRUCCION, 2011, 10 (01): : 36 - 52
  • [27] Using the villego® simulation to teach the last planner® system
    1600, Lean Construction Institute (2014):
  • [28] Management Thinking in the Earned Value Method System and the Last Planner System
    Kim, Yong-Woo
    Ballard, Glenn
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (04) : 223 - 228
  • [29] Motivations, benefits, and challenges of university-industry partnerships in Kazakhstan
    Jonbekova, Dilrabo
    Kuchumova, Gulfiya
    Kim, Tatyana
    Mukhamejanova, Dinara
    Gimranova, Dilbar
    Abdildin, Yerkin
    Alimkhanova, Dinara
    INTERNATIONAL JOURNAL OF EDUCATIONAL RESEARCH, 2025, 130
  • [30] Organisational blogs: benefits and challenges of implementation
    Baxter, Gavin J.
    Connolly, Thomas M.
    Stansfield, Mark H.
    LEARNING ORGANIZATION, 2010, 17 (06): : 515 - +