Tackling the start-up of a reinforcement learning agent for the control of wastewater treatment plants

被引:24
|
作者
Hernandez-del-Olma, Felix [1 ]
Gaudioso, Elena [1 ]
Dormido, Raquel [2 ]
Duro, Natividad [2 ]
机构
[1] Natl Distance Educ Univ UNED, Dept Artificial Intelligence, Madrid 28040, Spain
[2] Natl Distance Educ Univ UNED, Dept Comp Sci & Automat Control, Madrid 28040, Spain
关键词
Reinforcement learning; Wastewater systems; Intelligent agent; Adaptive control; OPTIMIZATION; SYSTEMS;
D O I
10.1016/j.knosys.2017.12.019
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Reinforcement learning problems involve learning by doing. Therefore, a reinforcement learning agent will have to fail sometimes (while doing) in order to learn. Nevertheless, even with this starting error, introduced at least during the non-optimal learning stage, reinforcement learning can be affordable in some domains like the control of a wastewater treatment plant. However, in wastewater treatment plants, trying to solve the day-to-day problems, plant operators will usually not risk to leave their plant in the hands of an inexperienced and untrained reinforcement learning agent. In fact, it is somewhat obvious that plant operators will require firstly to check that the agent has been trained and that it works as it should at their particular plant In this paper, we present a solution to this problem by giving a previous instruction to the reinforcement learning agent before we let it act on the plant. In fact, this previous instruction is the key point of the paper. In addition, this instruction is given effortlessly by the plant operator. As we will see, this solution does not just solve the starting up problem of leaving the plant in the hands of an untrained agent, but it also improves the future performance of the agent. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:9 / 15
页数:7
相关论文
共 50 条
  • [31] Accelerated design and start-up of an SBR system for groundwood mill wastewater treatment
    Cocci, AA
    Almost, S
    McCarthy, PJ
    Brown, GJ
    [J]. 1997 ENVIRONMENTAL CONFERENCE & EXHIBIT, BOOKS 1 AND 2, 1997, : 871 - 877
  • [32] Start-up of an aerobic granular sequencing batch reactor for the treatment of winery wastewater
    Lopez-Palau, S.
    Dosta, J.
    Mata-Alvarez, J.
    [J]. WATER SCIENCE AND TECHNOLOGY, 2009, 60 (04) : 1049 - 1054
  • [33] Start-up and operation of UASB reactors at 20°C for municipal wastewater treatment
    Singh, KS
    Viraraghavan, T
    [J]. JOURNAL OF FERMENTATION AND BIOENGINEERING, 1998, 85 (06): : 609 - 614
  • [34] Power plant start-up scheduling: a reinforcement learning approach combined with evolutionary computation
    Kamiya, A
    Kimura, H
    Yamamura, M
    Kobayashi, S
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 1998, 6 (01) : 99 - 115
  • [35] Modeless Start-Up Control for Operational Flexibility of Combined Cycle Power Plants
    Yoshida, Yasuhiro
    Tokuda, Yuya
    Yoshida, Takuya
    Enomoto, Yuki
    Osaki, Nobuhiro
    Nagahama, Yoshito
    Tsuge, Yoshifumi
    [J]. JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, 2020, 53 (10) : 636 - 645
  • [36] The study of SNAD process start-up on domestic wastewater
    Zheng, Zhao-Ming
    Li, Ze-Bing
    Liu, Chang-Jing
    Chen, Guang-Hui
    Zheng, Lin-Xue
    Ma, Jing
    Li, Jun
    Zhao, Bai-Hang
    [J]. Zhongguo Huanjing Kexue/China Environmental Science, 2015, 35 (04): : 1072 - 1081
  • [37] Kinetic start-up performance of two large treatment plants for nutrient removal
    Haarbo, A
    Harremoës, P
    Thirsing, C
    [J]. WATER SCIENCE AND TECHNOLOGY, 2001, 43 (11) : 153 - 160
  • [38] Intelligent Control of Wastewater Treatment Plants Based on Model-Free Deep Reinforcement Learning
    Aponte-Rengifo, Oscar
    Francisco, Mario
    Vilanova, Ramon
    Vega, Pastora
    Revollar, Silvana
    [J]. PROCESSES, 2023, 11 (08)
  • [39] Quick start-up of Mudanjiang wastewater treatment plant and factors influencing phosphorous removal
    Huang Peng
    Zhao Qingliang
    Qin Songyan
    Guo Xiu
    [J]. PROCEEDING OF THE 9TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND TECHNOLOGY VOL B - POSTER PRESENTATIONS, 2005, : B348 - B356
  • [40] ERECTION AND START-UP OF PLANTS FOR CHEMICAL AND PETROLEUM INDUSTRIES
    BECK, B