Project management under uncertainty: resource flexibility visualization in the schedule

被引:4
|
作者
Lima, Ricardo [1 ,2 ]
Tereso, Anabela [2 ]
Faria, Joao [2 ]
机构
[1] Fed Inst Goias, Informat Technol Res Grp NETI, BR-74400000 Inhumas, Brazil
[2] Univ Minho, Produt & Syst Dept, Ctr ALGORITMI, Campus Azurem, P-4804533 Guimaraes, Portugal
关键词
RCPSP-FRM; resource flexibility; project management; PLATFORM IMPLEMENTATION; ALLOCATION; CLASSIFICATION; MODELS; ROBUST;
D O I
10.1016/j.procs.2019.12.197
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Going from an idea to a result, using a series of well-defined techniques with deadlines and limited resources, is a skill that a project manager must have. In a rapidly changing environment like the present one, there are many factors that contribute to budget overruns and delays that occur in most major projects. To be successful, one must rely on techniques and tools that assist the project manager in the various stages of the project. Therefore, this paper presents an Add-In for MS Project, based on a previously developed model for solving the Resource Constraint Project Scheduling Problem with Flexible Resource Management (RCPSP-FRM), which can help the project manager with regard to the scheduling of resources using flexibility, giving him relevant information to the decision making process in case of delays during the execution phase. The flexible chart and table format view allows project managers to easily and objectively identify the activities which can have their durations increased or shortened, impacting significantly on project execution time. This research contributes not only to the academic environment, but also to professional project management environments. (C) 2019 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/) Peer-review under responsibility of the scientific committee of the CENTERIS -International Conference on ENTERprise Information Systems / ProjMAN - International Conference on Project MANagement / HCist - International Conference on Health and Social Care Information Systems and Technologies.
引用
收藏
页码:381 / 388
页数:8
相关论文
共 50 条
  • [41] The Visible Human Project™:: A resource for anatomical visualization
    Ackerman, MJ
    [J]. MEDINFO '98 - 9TH WORLD CONGRESS ON MEDICAL INFORMATICS, PTS 1 AND 2, 1998, 52 : 1030 - 1032
  • [42] Dealing with Competing Project Management Values under Uncertainty: the Case of RandstadRail
    Leijten, Martijn
    Koppenjan, Joop
    ten Heuvelhof, Ernst
    Veeneman, Wijnand
    van der Voort, Haiko
    [J]. EUROPEAN JOURNAL OF TRANSPORT AND INFRASTRUCTURE RESEARCH, 2010, 10 (01): : 63 - 76
  • [43] Project management under uncertainty beyond beta: The generalized bicubic distribution
    Garcia Perez, Jose
    Lopez Martin, Maria del Mar
    Garcia Garcia, Catalina
    Sanchez Granero, Miguel Angel
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2016, 3 : 67 - 76
  • [44] RESOURCE ALLOCATION UNDER UNCERTAINTY
    TRINKL, FH
    [J]. POLICY SCIENCES, 1975, 6 (01) : 29 - 40
  • [45] RESOURCE ALLOCATION UNDER UNCERTAINTY
    STIGUM, BP
    [J]. ECONOMETRICA, 1970, 38 (04) : 130 - &
  • [46] A hybrid projection method for resource-constrained project scheduling problem under uncertainty
    Aramesh, Saeed
    Aickelin, Uwe
    Khorshidi, Hadi Akbarzadeh
    [J]. NEURAL COMPUTING & APPLICATIONS, 2022, 34 (17): : 14557 - 14576
  • [47] A hybrid projection method for resource-constrained project scheduling problem under uncertainty
    Saeed Aramesh
    Uwe Aickelin
    Hadi Akbarzadeh Khorshidi
    [J]. Neural Computing and Applications, 2022, 34 : 14557 - 14576
  • [48] Schedule analysis under the effect of resource allocation
    Ibbs, William
    Nguyen, Long D.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (02) : 131 - 138
  • [49] Approaches to uncertainty in project management
    Krejci, Igor
    Kvasnicka, Roman
    [J]. AGRARIAN PERSPECTIVES XVIII, VOLS 1 AND 2, 2009, : 405 - 408
  • [50] PROJECT MANAGEMENT - CONTROLLING UNCERTAINTY
    STAROPLI, GK
    [J]. JOURNAL OF SYSTEMS MANAGEMENT, 1975, 26 (05): : 28 - 29