Multi-Batch Production Scheduling for Distributed Serial Lines with Unreliable Machines and Finite Buffers

被引:0
|
作者
Huang, Longzhu [1 ,2 ]
Jia, Zhiyang [1 ,2 ]
Wang, Xiaohan [1 ,2 ]
Chen, Jingchuan [1 ,2 ]
机构
[1] Beijing Inst Technol, Sch Automat, Beijing 100081, Peoples R China
[2] State Key Lab Intelligent Control & Decis Complex, Beijing 100081, Peoples R China
关键词
Bernoulli machine; Intelligent manufacturing; Production scheduling; Transient analysis; ALGORITHM; MODELS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the modern manufacturing environment, the production systems develop towards a flexible direction due to the market demands of multiple varieties and small batch-based customized products. To make better use of the existing resources and to improve production efficiency, distributed manufacturing mode begins to appear. This paper concentrates on a multi-type production scheduling problem for distributed serial lines. Specifically, unreliable machines and finite buffers are considered, which are more realistic in the practical production. The mathematical model for the production system with two Bernoulli machines is formulated first. Then, under the hypothetical model mentioned above, the main work of this article is to propose the exact and approximate analyses to calculate the performance indicators. Based on the analysis of the model, the genetic algorithm is applied to optimize the maximum completion time on the distributed serial lines for multi-batch-based production tasks. Finally, the feasibility and effectiveness of the mathematical model and the proposed algorithm are verified through numerical experiments.
引用
收藏
页码:6436 / 6441
页数:6
相关论文
共 50 条
  • [31] Production variability of production lines with unreliable machines
    He, XF
    Wu, S
    Li, QL
    Proceedings of the 4th International Conference on Quality & Reliability, 2005, : 921 - 927
  • [32] Scheduling policy and performance analysis of multi-product two-stage serial lines with batch machines
    Yan, Fei-Yi
    Wang, Jun-Qiang
    Kongzhi yu Juece/Control and Decision, 2024, 39 (11): : 3791 - 3800
  • [33] Selective Assembly System With Unreliable Bernoulli Machines and Finite Buffers
    Ju, Feng
    Li, Jingshan
    Deng, Weiwen
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2017, 14 (01) : 171 - 184
  • [34] Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers
    Colledani, M.
    Gandola, F.
    Matta, A.
    Tolio, T.
    IIE TRANSACTIONS, 2008, 40 (06) : 612 - 626
  • [35] Performance analysis of a transfer line with unreliable machines and finite buffers
    Xie, Xialoan
    IIE Transactions (Institute of Industrial Engineers), 1993, 25 (01): : 99 - 108
  • [36] MODELING AND ANALYSIS OF ASSEMBLY SYSTEMS WITH UNRELIABLE MACHINES AND FINITE BUFFERS
    DIMASCOLO, M
    DAVID, R
    DALLERY, Y
    IIE TRANSACTIONS, 1991, 23 (04) : 315 - 330
  • [37] PERFORMANCE ANALYSIS OF A TRANSFER LINE WITH UNRELIABLE MACHINES AND FINITE BUFFERS
    XIE, XL
    IIE TRANSACTIONS, 1993, 25 (01) : 99 - 108
  • [38] Performance analysis of assembly systems with unreliable machines and finite buffers
    Yuan, XM
    Liu, LM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (03) : 854 - 871
  • [39] ANALYSIS OF TRANSFER LINES CONSISTING OF 2 UNRELIABLE MACHINES WITH RANDOM PROCESSING TIMES AND FINITE STORAGE BUFFERS
    GERSHWIN, SB
    BERMAN, O
    AIIE TRANSACTIONS, 1981, 13 (01): : 2 - 11
  • [40] Re-entrant lines with unreliable asynchronous machines and finite buffers: performance approximation and bottleneck identification
    Liu, Yang
    Li, Jingshan
    Chiang, Shu-Yin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (04) : 977 - 990