Multi-Batch Production Scheduling for Distributed Serial Lines with Unreliable Machines and Finite Buffers

被引:0
|
作者
Huang, Longzhu [1 ,2 ]
Jia, Zhiyang [1 ,2 ]
Wang, Xiaohan [1 ,2 ]
Chen, Jingchuan [1 ,2 ]
机构
[1] Beijing Inst Technol, Sch Automat, Beijing 100081, Peoples R China
[2] State Key Lab Intelligent Control & Decis Complex, Beijing 100081, Peoples R China
关键词
Bernoulli machine; Intelligent manufacturing; Production scheduling; Transient analysis; ALGORITHM; MODELS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the modern manufacturing environment, the production systems develop towards a flexible direction due to the market demands of multiple varieties and small batch-based customized products. To make better use of the existing resources and to improve production efficiency, distributed manufacturing mode begins to appear. This paper concentrates on a multi-type production scheduling problem for distributed serial lines. Specifically, unreliable machines and finite buffers are considered, which are more realistic in the practical production. The mathematical model for the production system with two Bernoulli machines is formulated first. Then, under the hypothetical model mentioned above, the main work of this article is to propose the exact and approximate analyses to calculate the performance indicators. Based on the analysis of the model, the genetic algorithm is applied to optimize the maximum completion time on the distributed serial lines for multi-batch-based production tasks. Finally, the feasibility and effectiveness of the mathematical model and the proposed algorithm are verified through numerical experiments.
引用
收藏
页码:6436 / 6441
页数:6
相关论文
共 50 条
  • [21] Modeling and analysis of production line systems with unreliable machines and finite buffers
    Wu, Naiqi
    Zhuang, Songxin
    Xue, Jinsong
    Zidonghua Xuebao/Acta Automatica Sinica, 1991, 17 (04):
  • [22] A NOTE ON TRANSFER LINES WITH UNRELIABLE MACHINES, RANDOM PROCESSING TIMES, AND FINITE BUFFERS
    ALTIOK, TM
    STIDHAM, S
    IIE TRANSACTIONS, 1982, 14 (02) : 125 - 127
  • [23] Transient Analysis and Scheduling of Bernoulli Serial Lines With Multi-Type Products and Finite Buffers
    Wang, Xiaohan
    Dai, Yaping
    Wang, Ling
    Jia, Zhiyang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, 20 (04) : 2367 - 2382
  • [24] MODELING AND ANALYSIS OF 3-STAGE TRANSFER LINES WITH UNRELIABLE MACHINES AND FINITE BUFFERS
    GERSHWIN, SB
    SCHICK, IC
    OPERATIONS RESEARCH, 1983, 31 (02) : 354 - 380
  • [25] Performance approximation of re-entrant lines with unreliable exponential machines and finite buffers
    Yang Liu
    Jingshan Li
    Shu-Yin Chiang
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 1151 - 1159
  • [26] DYNAMIC BEHAVIOR OF N-STAGE TRANSFER LINES WITH UNRELIABLE MACHINES AND FINITE BUFFERS
    WESFREID, E
    LECTURE NOTES IN CONTROL AND INFORMATION SCIENCES, 1986, 83 : 227 - 233
  • [27] Performance approximation of re-entrant lines with unreliable exponential machines and finite buffers
    Liu, Yang
    Li, Jingshan
    Chiang, Shu-Yin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (9-12): : 1151 - 1159
  • [28] An improved decomposition method for evaluating the performance of transfer lines with unreliable machines and finite buffers
    Xia, Beixin
    Xi, Lifeng
    Zhou, Binghai
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (15) : 4009 - 4024
  • [29] Improvement of the evaluation of closed-loop production systems with unreliable machines and finite buffers
    Shi, Chuan
    Gershwin, Stanley B.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 75 : 239 - 256
  • [30] Performance evaluation of flow lines with non-identical and unreliable parallel machines and finite buffers
    Diamantidis, Alexandros
    Lee, Jun-Ho
    Papadopoulos, Chrissoleon T.
    Li, Jingshan
    Heavey, Cathal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (13) : 3881 - 3904