共 50 条
- [41] A completely digital workflow for the transition from a failed dentition to interim complete-arch fixed implant-supported prostheses: A clinical report [J]. JOURNAL OF PROSTHETIC DENTISTRY, 2022, 127 (04): : 527 - 532
- [44] Evaluation of the intaglio surface shape of implant-supported complete-arch maxillary prostheses and its association with biological complications: An analytical cross-sectional study [J]. JOURNAL OF PROSTHETIC DENTISTRY, 2022, 128 (02): : 174 - 180
- [45] Clinical Performance of Complete-Arch Implant-Supported Rehabilitations Using Monolithic Lithium Disilicate Restorations Bonded to CAD/CAM Titanium and Zirconia Frameworks up to 5 Years [J]. EUROPEAN JOURNAL OF PROSTHODONTICS AND RESTORATIVE DENTISTRY, 2022, 30 (04): : 296 - 304
- [46] Zirconia-veneered polyetherketoneketone frameworks of implant-supported complete arch fixed dental prostheses: A report on 5 patients [J]. JOURNAL OF PROSTHETIC DENTISTRY, 2023, 130 (04): : 419 - 433
- [47] Optimal number of implants for complete-arch implant-supported prostheses with a follow-up of at least 5 years: A systematic review and meta-analysis [J]. JOURNAL OF PROSTHETIC DENTISTRY, 2019, 121 (05): : 766 - +
- [48] RESEARCH AND EDUCATION Comparison of strength of milled and conventionally processed PMMA complete-arch implant-supported immediate interim fixed dental prostheses [J]. JOURNAL OF PROSTHETIC DENTISTRY, 2023, 129 (01): : 221 - 227
- [50] COMPLETE-MOUTH IMPLANT REHABILITATION WITH MODIFIED MONOLITHIC ZIRCONIA IMPLANT-SUPPORTED FIXED DENTAL PROSTHESES AND AN IMMEDIATE-LOADING PROTOCOL: A CLINICAL REPORT [J]. JOURNAL OF PROSTHETIC DENTISTRY, 2013, 109 (06): : 347 - 352