Simulation of bored pile construction

被引:0
|
作者
Zayed, TM [1 ]
Halpin, DW [1 ]
机构
[1] Zagazig Univ, Fac Engn, Construct Engn & Manag Dept, Zagazig, Egypt
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both piling process productivity and cycle time assessment are addressed. Data were collected for this study through designed questionnaires, site inter-views, and telephone calls to experts in different construction companies. Many variables have been considered in the piling construction process. Two simulation models have been designed and validated to assess piling process productivity and cycle time. Consequently, two sets of charts have been developed based upon the validated models to provide the decision-maker with a solid planning, scheduling and control toot for piling projects.
引用
收藏
页码:1495 / 1503
页数:9
相关论文
共 50 条
  • [31] Numerical simulation of compressive mechanical characters of new bored grouting PHC nodular pile
    Yang Miao
    Zhang Zhong-miao
    Liu Nian-wu
    Shi Mao-fei
    Zhang Ri-hong
    ROCK AND SOIL MECHANICS, 2013, 34 (07) : 2119 - 2126
  • [32] Numerical simulation of effects of mud cake and bottom sediment on bearing capacity of bored pile
    Zhou, Hong-Bo
    Yantu Lixue/Rock and Soil Mechanics, 2007, 28 (05): : 956 - 960
  • [33] Analysis of small disturbing construction of protective jacket tube for cast-in-situ bored pile
    Huang Da-wei
    Zhou Shun-hua
    Liu Chong-qing
    Chen Tian-wen
    ROCK AND SOIL MECHANICS, 2013, 34 (04) : 1103 - 1108
  • [34] Field tests on behavior of pre-bored grouted planted pile and bored pile embedded in deep soft clay
    Zhou, Jia-jin
    Yu, Jian-lin
    Gong, Xiao-nan
    Yan, Tian-long
    SOILS AND FOUNDATIONS, 2020, 60 (02) : 551 - 561
  • [35] DEM analysis of pile installation effect: comparing a bored and a driven pile
    Duan, Nuo
    Cheng, Yi Pik
    Liu, Jun Wei
    GRANULAR MATTER, 2018, 20 (03)
  • [36] DEM analysis of pile installation effect: comparing a bored and a driven pile
    Nuo Duan
    Yi Pik Cheng
    Jun Wei Liu
    Granular Matter, 2018, 20
  • [37] Bored Pile Settlement Analysis of Pile End Grouting in Civil Engineering
    Li, Shaohe
    Lin, Qunxian
    Wu, Jian
    ADVANCED RESEARCH ON CIVIL ENGINEERING AND MATERIAL ENGINEERING, 2012, 568 : 99 - +
  • [38] Analysis on pile testing results of post-grouting bored pile
    Zheng, A. R.
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [39] TEST OF BORED PILE WITHOUT BALLAST AND ANCHOR
    JAROMINIAK, A
    PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1989, : 1153 - 1154
  • [40] Post-grouting bored pile technology
    Zheng, A. R.
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61