Simulation of bored pile construction

被引:0
|
作者
Zayed, TM [1 ]
Halpin, DW [1 ]
机构
[1] Zagazig Univ, Fac Engn, Construct Engn & Manag Dept, Zagazig, Egypt
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both piling process productivity and cycle time assessment are addressed. Data were collected for this study through designed questionnaires, site inter-views, and telephone calls to experts in different construction companies. Many variables have been considered in the piling construction process. Two simulation models have been designed and validated to assess piling process productivity and cycle time. Consequently, two sets of charts have been developed based upon the validated models to provide the decision-maker with a solid planning, scheduling and control toot for piling projects.
引用
收藏
页码:1495 / 1503
页数:9
相关论文
共 50 条
  • [21] Numerical simulation of bored pile on foundation pit support in soft soil deposits
    Wang, Jing
    Liu, Xiaoqing
    Xie, Xiaochen
    Qi, Huijun
    BIOTECHNOLOGY, CHEMICAL AND MATERIALS ENGINEERING III, PTS 1 AND 2, 2014, 884-885 : 679 - +
  • [22] Research on groundwater pollution brought out by leachate of municipal refuse in bored pile construction
    Yang Ming-liang
    Yao Hai-lin
    Heng Qi-ling
    Luo Xing-wen
    ROCK AND SOIL MECHANICS, 2005, 26 (04) : 586 - 590
  • [23] Case Studies on Environmental Emissions of Machinery and Material Use due to Bored Pile Construction
    Perera, W. D. C.
    Karunaratne, S. C. S.
    Peiris, T. S. G.
    ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2025, 58 (01): : 139 - 148
  • [24] Discussions on the Construction Technology of the Vibrating Inserting Rod Long Auger Bored Pile -CFA
    Wang Jiujun
    ADVANCED MATERIALS AND PROCESSES III, PTS 1 AND 2, 2013, 395-396 : 473 - 476
  • [25] Bored pile foundation at great Depths
    不详
    BAUINGENIEUR, 2014, 89 : A12 - A12
  • [26] Bored pile foundations in offshore conditions
    Ellman, Roderic A., Jr.
    Rhyner, Frederick C.
    DEEP FOUNDATIONS ON BORED AND AUGER PILES, PROCEEDINGS, 2009, : 47 - 58
  • [27] Quality assurance of bored pile foundations
    Cameron, Gordon
    Chapman, Tim
    Ground Engineering, 2004, 37 (02): : 35 - 40
  • [28] Reinforcing design and construction technology of large-diameter artificial bored pile segregation accident
    Shao, Guang-Biao
    Sun, Jian-Ping
    Jiang, Zong-Bao
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (SUPPL. 2): : 260 - 264
  • [29] Numerical simulation of effects of mud cake and bottom sediment on bearing capacity of bored pile
    Zhou Hong-bo
    ROCK AND SOIL MECHANICS, 2007, 28 (05) : 956 - 960
  • [30] Research on Construction Technology of cast-in-situ bored pile under Complex Geological Conditions
    Wu, Y. H.
    Zhou, Z.
    Chen, W. Q.
    Liu, S. Y.
    Zhang, B. C.
    Huang, H. F.
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510