Simulation of bored pile construction

被引:0
|
作者
Zayed, TM [1 ]
Halpin, DW [1 ]
机构
[1] Zagazig Univ, Fac Engn, Construct Engn & Manag Dept, Zagazig, Egypt
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both piling process productivity and cycle time assessment are addressed. Data were collected for this study through designed questionnaires, site inter-views, and telephone calls to experts in different construction companies. Many variables have been considered in the piling construction process. Two simulation models have been designed and validated to assess piling process productivity and cycle time. Consequently, two sets of charts have been developed based upon the validated models to provide the decision-maker with a solid planning, scheduling and control toot for piling projects.
引用
收藏
页码:1495 / 1503
页数:9
相关论文
共 50 条
  • [1] Characterize concrete demand in bored-pile construction through simulation
    Lu, M
    Ying, KC
    ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1705 - 1712
  • [2] Auger and Bored pile construction monitoring and testing
    Bustamante, M
    DEEP FOUNDATIONS ON BORED AND AUGER PILES, 2003, : 27 - 41
  • [3] Bridge bored pile construction management and accident treatment
    Zhang, Yonghong
    Tang, Lijun
    Wang, Ning
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 1535 - +
  • [4] Diagnostic decision support system for bored pile construction
    Tamane, SP
    Fisher, DJ
    O'Neill, MW
    FOURTEENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1997, : 899 - 901
  • [5] Construction technology and quality control measures of bored pile
    Hui, Ming-hua
    Gu, Lian-sheng
    Tang, Di-lian
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 1946 - 1950
  • [6] RECENT DEVELOPMENTS IN SECANT BORED PILE WALL CONSTRUCTION
    SHERWOOD, DE
    HARNAN, CN
    BEYER, MG
    PILING AND DEEP FOUNDATIONS, VOL 1, 1989, : 211 - 220
  • [7] Construction techniques of long bored pile embedded in rock
    Li, Shi-Ren
    Chen, De-Wen
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2001, 23 (06):
  • [8] Comprehensive evaluation of Safety for bored pile construction of Chishi Bridge
    Zhu, Zi-qiang
    Feng, Xiong-hui
    He, Xian-qi
    Lu, Guang-yin
    APPLIED DECISIONS IN AREA OF MECHANICAL ENGINEERING AND INDUSTRIAL MANUFACTURING, 2014, 577 : 1104 - +
  • [9] Application and Construction Technology of Post-Grouting Bored Pile
    Fang, Pengfei
    Zhang, Hang
    Kong, Qinghua
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 737 - 740
  • [10] Recycling Waste Soils for Stability Enhancement in Bored Pile Construction
    Li, Feng
    Zhang, Lei
    Wang, Zhengzhen
    Liu, Qiqi
    Su, Tiantao
    Wang, Jinke
    BUILDINGS, 2025, 15 (02)