Optimisation for job scheduling at automated container terminals using genetic algorithm

被引:58
|
作者
Skinner, Bradley [1 ]
Yuan, Shuai [1 ]
Huang, Shoudong [1 ]
Liu, Dikai [1 ]
Cai, Binghuang [1 ]
Dissanayake, Gamini [1 ]
Lau, Haye [2 ]
Bott, Andrew [2 ]
Pagac, Daniel [2 ]
机构
[1] Univ Technol Sydney, FEIT, Sch Elect Mech & Mechatron Syst, Sydney, NSW 2007, Australia
[2] Patrick Technol Syst, Botany, NSW 2019, Australia
基金
澳大利亚研究理事会;
关键词
Modelling; Scheduling; Genetic algorithms; Autonomous straddle carrier; Automated seaport container terminals; DELIVERY PROBLEM; OPERATIONS-RESEARCH; DISPATCHING METHOD; TIME WINDOWS; PICKUP; VEHICLES;
D O I
10.1016/j.cie.2012.08.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a genetic algorithm (GA)-based optimisation approach to improve container handling operations at the Patrick AutoStrad container terminal located in Brisbane Australia. In this paper we focus on scheduling for container transfers and encode the problem using a two-part chromosome approach which is then solved using a modified genetic algorithm. In simulation experiments, the performance of the GA-based approach and a sequential job scheduling method are evaluated and compared with different scheduling scenarios. The experimental results show that the GA-based approach can find better solutions which improve the overall performance. The GA-based approach has been implemented in the terminal scheduling system and the live testing results show that the GA-based approach can reduce the overall time-related cost of container transfers at the automated container terminal. Crown Copyright (C) 2012 Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:511 / 523
页数:13
相关论文
共 50 条
  • [31] Optimization of integrated scheduling of handling and storage operations at automated container terminals
    Homayouni S.M.
    Tang S.H.
    WMU Journal of Maritime Affairs, 2016, 15 (1) : 17 - 39
  • [32] Solving the Twin Yard Crane Scheduling Problem in Automated Container Terminals
    Oladugba, A. O.
    Gheith, M.
    Eltawil, A.
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1398 - 1402
  • [33] Optimisation of job shop scheduling problem using genetic algorithm and simulated annealing: a case study of manufacturing industry
    Phanden, Rakesh Kumar
    Gupta, Shrajal
    Wolde, Biruk
    Kumar, Ravinder
    Chakraborty, Ayon
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2025, : 883 - 892
  • [34] Automated Train Scheduling System using Genetic Algorithm
    Barman, Rahul
    Baishya, Chandra Jyoti
    Kharmalki, Bandonlang
    Syiemlieh, Aphibakordor
    Pegu, Kriti Bikash
    Das, Tanuja
    Saha, Goutam
    2015 INTERNATIONAL SYMPOSIUM ON ADVANCED COMPUTING AND COMMUNICATION (ISACC), 2015, : 28 - 33
  • [35] Research on cooperative scheduling of berths, quay cranes and container trucks based on multi-population genetic algorithm at container terminals
    Yu, Meng
    Ren, Yucong
    Ma, Xiaoyun
    2020 3RD WORLD CONFERENCE ON MECHANICAL ENGINEERING AND INTELLIGENT MANUFACTURING (WCMEIM 2020), 2020, : 747 - 751
  • [36] Optimisation of Collaborative Spectrum Sensing with SIMO Cognitive Terminals using Genetic Algorithm
    Arshad, Kamran
    Moessner, Klaus
    2009 IEEE 20TH INTERNATIONAL SYMPOSIUM ON PERSONAL, INDOOR AND MOBILE RADIO COMMUNICATIONS, 2009, : 1707 - 1711
  • [37] Scheduling yard crane in a port container terminal using genetic algorithm
    Ng, W. C.
    Mak, K. L.
    Tsang, W. S.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2006, 13 (03): : 246 - 253
  • [38] Job scheduling in multi processor architecture using genetic algorithm
    Moattar, Elnaz Zafarani
    Rahmani, Amir Masoud
    Derakhshi, Mohammad Reza Feizi
    2007 INNOVATIONS IN INFORMATION TECHNOLOGIES, VOLS 1 AND 2, 2007, : 378 - 381
  • [39] Grid job scheduling using Route with Genetic Algorithm support
    Rodrigo F. de Mello
    José A. Andrade Filho
    Luciano J. Senger
    Laurence T. Yang
    Telecommunication Systems, 2008, 38 : 147 - 160
  • [40] Adaptive job scheduling for a service Grid using a genetic algorithm
    Gao, Y
    Rong, HQ
    Tong, F
    Luo, ZW
    Huang, J
    GRID AND COOPERATIVE COMPUTING, PT 2, 2004, 3033 : 65 - 72