l Analytical properties of an imperfect repair model and application in preventive maintenance scheduling

被引:44
|
作者
Dinh Tuan Nguyen [1 ,2 ]
Dijoux, Yann [1 ]
Fouladirad, Mitra [1 ]
机构
[1] Univ Technol Troyes, Lab Modelisat & Surete Syst, 12 Rue Marie Curie,CS 42060, F-10004 Troyes, France
[2] INSA RENNES, 20 Ave Buttes de Coesmes, F-35708 Rennes, France
关键词
Imperfect repair; Virtual age; Stationary regime; Limiting distribution; Preventive maintenance; OPTIMAL REPAIR/REPLACEMENT POLICY; GENERAL REPAIR; REPLACEMENT POLICY; SYSTEMS; ALGORITHM; SUBJECT;
D O I
10.1016/j.ejor.2016.06.026
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper considers repairable systems under imperfect repair. The failure rate of a new system is assumed to follow a Weibull distribution and the repair efficiency is characterized by a Kijima type II virtual age model named Arithmetic Reduction of Age with infinite memory. An analytical approach to obtain the distribution of the inter-failure times is presented. The existence of a stationary regime is highlighted and the limiting distributions are explicitly derived. In this context, an optimal age-based preventive maintenance policy can be implemented. Three approaches are proposed, considering a static, a dynamic or a failure limit policy. Numerical simulations are presented to illustrate the policies. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:439 / 453
页数:15
相关论文
共 50 条
  • [41] A Joint Optimization Model for Production Scheduling and Preventive Maintenance Interval
    Babaeimorad, S.
    Fattahi, P.
    Fazlollahtabar, H.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (11): : 2508 - 2516
  • [42] A full history proportional hazards model for preventive maintenance scheduling
    Kobbacy, KAH
    Fawzi, BB
    Percy, DF
    Ascher, HE
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 1997, 13 (04) : 187 - 198
  • [43] AN ECONOMIC PREVENTIVE MAINTENANCE SCHEDULING MODEL WITH TRUNCATED GAMMA FUNCTION
    NTUEN, CA
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 1991, 31 (01) : 31 - 38
  • [44] Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability
    Liu G.
    Long X.
    Tong S.
    Zhang R.
    Chen S.
    Journal of Shanghai Jiaotong University (Science), 2019, 24 (04) : 490 - 495
  • [45] Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability
    刘葛辉
    龙翔宇
    仝硕
    张瑞
    陈绍宽
    Journal of Shanghai Jiaotong University(Science), 2019, 24 (04) : 490 - 495
  • [46] An accelerated MIP model for the single machine scheduling with preventive maintenance
    Souissi, Omar
    Benmansour, Rachid
    Artiba, Abdelhakim
    IFAC PAPERSONLINE, 2016, 49 (12): : 1945 - 1949
  • [47] A New Model of Preventive Maintenance Scheduling for Parallel Production Line
    Wang, Qiang
    Li, Dongming
    Zhang, Xiaojie
    2016 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-CHENGDU), 2016,
  • [48] An integrated mathematical model for production scheduling and preventive maintenance planning
    Kolus, Ahmet
    El-Khalifa, Ahmed
    Al-Turki, Umar M.
    Duffuaa, Salih Osman
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2020, 37 (6-7) : 925 - 937
  • [49] A joint optimization model for production scheduling and preventive maintenance interval
    Babaeimorad S.
    Fattahi P.
    Fazlollahtabar H.
    International Journal of Engineering, Transactions B: Applications, 2021, 34 (11): : 2508 - 2516
  • [50] Heat exchanger fouling model and preventive maintenance scheduling tool
    Radhakrishnan, V. R.
    Ramasamy, M.
    Zabiri, H.
    Do Thanh, V.
    Tahir, N. M.
    Mukhtar, H.
    Hamdi, M. R.
    Ramli, N.
    APPLIED THERMAL ENGINEERING, 2007, 27 (17-18) : 2791 - 2802