A New Model of Preventive Maintenance Scheduling for Parallel Production Line

被引:0
|
作者
Wang, Qiang [1 ]
Li, Dongming [1 ]
Zhang, Xiaojie [2 ]
机构
[1] Equipment Mfg Ctr, Res Inst CETC NRIEE 28, Nanjing, Jiangsu, Peoples R China
[2] Nanjing Panda Handa Sci & Technol Ltd, Inst Commun Technol, Nanjing, Jiangsu, Peoples R China
关键词
maintenance scheduling; preventative maintenance; parallel production line; urgent task;
D O I
暂无
中图分类号
R-058 [];
学科分类号
摘要
Based on the analysis of the difficulty of preventative maintenance scheduling for Multi-product Parallel Production Line in equipment manufacturing industry, this paper establishes the preventive maintenance scheduling model which chooses the maximal of urgent task production as the objective function and multi-product production, preventive maintenance time windows, maintenance groups as the constraints. The successful solution of preventive maintenance scheduling example in an equipment manufacturing factory is the proof of the accuracy and usefulness of the model.
引用
收藏
页数:4
相关论文
共 50 条
  • [1] Generalizing of the integration of noncyclical preventive maintenance scheduling and production planning for a series-parallel production line
    el Cadi, Abdessamad Ait
    El Hachemi, Nizar
    Artiba, Abdelhakim
    Jamali, Mohamed Anouar
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 216 - 219
  • [2] Integrated production planning and preventive maintenance scheduling for synchronized parallel machines
    Liu, Yu
    Zhang, Qin
    Ouyang, Zhiyuan
    Huang, Hong-Zhong
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 215
  • [3] Joint optimization of preventive maintenance and production scheduling for parallel machines system
    Liao, Wenzhu
    Chen, Maocai
    Yang, Xiaoxia
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 32 (01) : 913 - 923
  • [4] An Optimization Model Integrated Production Scheduling and Preventive Maintenance for Group Production
    Liao, Wenzhu
    Zhang, Xiufang
    Jiang, Min
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 936 - 940
  • [5] A Joint Optimization Model for Production Scheduling and Preventive Maintenance Interval
    Babaeimorad, S.
    Fattahi, P.
    Fazlollahtabar, H.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (11): : 2508 - 2516
  • [6] Integrating non-cyclical preventive maintenance scheduling and production planning for a series-parallel production line with stochastic dependence
    Bahou, Ziyad
    Krimi, Issam
    Ait El Cadi, Abdessamad
    Hachemi, Nizar El
    [J]. International Journal of Industrial and Systems Engineering, 2024, 47 (03) : 354 - 381
  • [7] An integrated mathematical model for production scheduling and preventive maintenance planning
    Kolus, Ahmet
    El-Khalifa, Ahmed
    Al-Turki, Umar M.
    Duffuaa, Salih Osman
    [J]. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2020, 37 (6-7) : 925 - 937
  • [8] A joint optimization model for production scheduling and preventive maintenance interval
    Babaeimorad S.
    Fattahi P.
    Fazlollahtabar H.
    [J]. International Journal of Engineering, Transactions B: Applications, 2021, 34 (11): : 2508 - 2516
  • [9] AN INTEGRATED MODEL OF PRODUCTION SCHEDULING AND MAINTENANCE PLANNING UNDER IMPERFECT PREVENTIVE MAINTENANCE
    Chen, Xiaohui
    Xiao, Lei
    Zhang, Xinghui
    Xiao, Weixiao
    Li, Junxing
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (01): : 70 - 79
  • [10] Multi-objective modeling for preventive maintenance scheduling in a multiple production line
    Ebrahimipour, V.
    Najjarbashi, A.
    Sheikhalishahi, M.
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (01) : 111 - 122