This paper involves a precast production with double layer in identical parallel molds. The precast production consists of 5 processes to be produced sequentially. Each process requires a specific resource that must be shared among molds except the curing process which does not require any resources. There are 5 concrete formulas for considering that do not effect on the precast quality. Nevertheless, each formula results in different costs and different processing time. The more expensive formula requires the shorter processing time. We propose an MIP model to select formulas and schedule all jobs to finish within due date.
引用
收藏
页码:85 / 89
页数:5
相关论文
共 50 条
  • [21] IMPROVED EIGHT-PROCESS MODEL OF PRECAST COMPONENT PRODUCTION SCHEDULING CONSIDERING RESOURCE CONSTRAINTS
    Ruan, Minhao
    Xu, Feng
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (03) : 208 - 222
  • [22] A mathematical model of an electrochemical capacitor with double-layer and faradaic processes
    Lin, C
    Ritter, JA
    Popov, BN
    White, RE
    [J]. JOURNAL OF THE ELECTROCHEMICAL SOCIETY, 1999, 146 (09) : 3168 - 3175
  • [23] Modeling Worker Competence to Advance Precast Production Scheduling Optimization
    Wang, Zhaojing
    Hu, Hao
    Gong, Jie
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (11)
  • [24] Integrated resource allocation and production scheduling for parallel concrete precast production lines
    Xiong, Fu-Li
    Zhang, Xing
    Cao, Jin-Song
    Yuan, Zi-Yang
    Chu, Meng-Ling
    Du, Yao
    [J]. Kongzhi yu Juece/Control and Decision, 2022, 37 (09): : 2399 - 2406
  • [25] A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling
    Fathollahzadeh, Karo
    Mardaneh, Elham
    Cigla, Mehmet
    Asad, Mohammad Waqar Ali
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2021, 31 (04) : 717 - 728
  • [26] Research on the Personnel Scheduling Mathematical Model in Labor-intensive Production Units
    Wang, Yiqi
    Zhang, Xiaodong
    Zhao, Dongfang
    Zhang, Enwu
    [J]. INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL AUTOMATION (ICITIA 2015), 2015, : 441 - 447
  • [27] A mathematical model for open pit mine production scheduling with Grade Engineering~? and stockpiling
    Karo Fathollahzadeh
    Elham Mardaneh
    Mehmet Cigla
    Mohammad Waqar Ali Asad
    [J]. International Journal of Mining Science and Technology, 2021, 31 (04) : 717 - 728
  • [28] Scheduling algorithm and scheduling mathematical model of machining time
    Tian, Ya
    Yang, Peng
    Song, Xiaokui
    Shi, Tianlin
    [J]. AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 2349 - 2352
  • [29] DOUBLE LAYER PROGRAMMING MODEL TO THE SCHEDULING OF REMOTE SENSING DATA PROCESSING TASKS
    He, Min-Fan
    Xing, Li-Ning
    Li, Wen
    Xiang, Shang
    Tan, Xu
    [J]. DISCRETE AND CONTINUOUS DYNAMICAL SYSTEMS-SERIES S, 2019, 12 (4-5): : 1515 - 1526
  • [30] Scheduling algorithm and scheduling mathematical model of machining time
    [J]. Yang, Peng, 1600, TeknoScienze, Viale Brianza,22, Milano, 20127, Italy (28):