Two-staged early cost estimation for highway construction projects

被引:6
|
作者
Kim, Du Yon [1 ]
Kim, Byoungil [1 ]
Han, Seung Heon [1 ]
机构
[1] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
early cost estimate; highway construction project; case-based reasoning; regression tree; quantity-based model;
D O I
10.3846/isarc.20080626.490
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various research have been attempted to develop cost prediction models in the early stage of a construction life-cycle. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the case-based reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.
引用
收藏
页码:490 / 495
页数:6
相关论文
共 50 条
  • [21] Cost evaluation for a two-staged reverse osmosis and pressure retarded osmosis desalination process
    Sawaki, Naomi
    Chen, Cheng-Liang
    DESALINATION, 2021, 497
  • [22] Development of Two-Staged Seeded Swelling Polymerization
    Lei Jinhua
    Wang Honghua
    Li Dongliang
    Zhou Guangyuan
    PROGRESS IN CHEMISTRY, 2009, 21 (06) : 1287 - 1291
  • [23] Abstract Parsing for Two-staged Languages with Concatenation
    Kong, Soonho
    Choi, Wontae
    Yi, Kwangkeun
    ACM SIGPLAN NOTICES, 2010, 45 (02) : 109 - 116
  • [24] Two-staged surgery for complicated retinal detachment
    Gandhi, Rajiv M.
    CLINICAL AND EXPERIMENTAL OPHTHALMOLOGY, 2023, 51 (09): : 1046 - 1046
  • [25] A modeling of two-staged FCC technology.
    Honghong, S
    Jianfang, Z
    Guangxun, W
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1998, 215 : U115 - U115
  • [26] Optimal two-staged schemes for stiff systems
    Kalitkin, NN
    Panchenko, SL
    DOKLADY AKADEMII NAUK, 1998, 361 (03) : 307 - 310
  • [27] An experimental study of the two-staged wind turbines
    Ushiyama, I
    Shimota, T
    Miura, Y
    RENEWABLE ENERGY, 1996, 9 (1-4) : 909 - 912
  • [28] A two-staged technique for basilic vein transposition
    Pasch, A. R.
    JOURNAL OF VASCULAR ACCESS, 2007, 8 (04): : 225 - 227
  • [29] Impact of Correlation on Cost-Risk Analysis for Construction Highway Projects
    Tran, Dai
    Bypaneni, Sai
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 668 - 678
  • [30] Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects
    Bakri, Anis Sazira
    Ab Razak, Muhammad Aminudin
    Abd Shukor, Ani Saifuza
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 280 - 288