Integrated capacity and inventory management with capacity acquisition lead times

被引:17
|
作者
Mincsovics, Gergely [1 ]
Tan, Tarkan [1 ]
Alp, Osman [2 ]
机构
[1] Tech Univ Eindhoven, Dept Technol Management, NL-5600 MB Eindhoven, Netherlands
[2] Bilkent Univ, Dept Ind Engn, TR-06800 Ankara, Turkey
关键词
Inventory; Production; Capacity acquisition lead time; Capacity management; Flexible capacity; DEMAND; EXPANSION; TURNOVER;
D O I
10.1016/j.ejor.2008.04.016
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We model a make-to-stock production system that utilizes permanent and contingent capacity to meet non-stationary stochastic demand, where a constant lead time is associated with the acquisition of contingent capacity. We determine the structure of the optimal solution concerning both the operational decisions of integrated inventory and flexible capacity management, and the tactical decision of determining the optimal permanent capacity level. Furthermore, we show that the inventory (either before or after production), the pipeline contingent capacity, the contingent capacity to be ordered, and the permanent capacity are economic substitutes. We also show that the stochastic demand variable and the optimal contingent capacity acquisition decisions are economic complements. Finally, we perform numerical experiments to evaluate the value of utilizing contingent capacity and to study the effects of capacity acquisition lead time, providing useful managerial insights. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:949 / 958
页数:10
相关论文
共 50 条
  • [1] MRP SYSTEMS CONSIDERING FUZZY CAPACITY, LEAD TIMES AND INVENTORY AVAILABILITY
    Cano, J. A.
    Gomez-Montoya, R. A.
    Cortes, P.
    Campo, E. A.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2021, 20 (01) : 29 - 39
  • [2] Integrated capacity and inventory decisions
    Dellaert, N. P.
    Flapper, S. D. P.
    Tan, T.
    Jeunet, J.
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 463 - 468
  • [3] Integrated workforce capacity and inventory management under labour supply uncertainty
    Pac, M. Fazil
    Alp, Osman
    Tan, Tarkan
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (15) : 4281 - 4304
  • [4] Inventory Management with Stochastic Lead Times
    Muthuraman, Kumar
    Seshadri, Sridhar
    Wu, Qi
    [J]. MATHEMATICS OF OPERATIONS RESEARCH, 2015, 40 (02) : 302 - 327
  • [5] Inventory Management with Advance Capacity Information
    Jaksic, M.
    Fransoo, J. C.
    Tan, T.
    de Kok, A. G.
    Rusjan, B.
    [J]. NAVAL RESEARCH LOGISTICS, 2011, 58 (04) : 355 - 369
  • [6] MATERIALS RECEIVING CAPACITY AND INVENTORY MANAGEMENT
    CAMPBELL, JF
    JOSHI, K
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1991, 19 (06): : 559 - 566
  • [7] Inventory Management for Customers with Alternative Lead Times
    Wang, Haifeng
    Yan, Houmin
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (06) : 705 - 720
  • [8] FACILITY LOCATION AND CAPACITY ACQUISITION - AN INTEGRATED APPROACH
    VERTER, V
    DINCER, MC
    [J]. NAVAL RESEARCH LOGISTICS, 1995, 42 (08) : 1141 - 1160
  • [9] Capacity and Inventory Management: Review, Trends, and Projections
    Song, Jing-Sheng
    van Houtum, Geert-Jan
    Van Mieghem, Jan A.
    [J]. M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2020, 22 (01) : 36 - 46
  • [10] Capacity planning and lead time management
    Zijm, WHM
    Buitenhek, R
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 46 : 165 - 179