Capacity planning and lead time management

被引:28
|
作者
Zijm, WHM
Buitenhek, R
机构
[1] Department of Mechanical Engineering, University of Twente, 7500 AE Enschede
关键词
queueing network; job shop; scheduling; due dates;
D O I
10.1016/0925-5273(95)00161-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we discuss a framework for capacity planning and lead time management in manufacturing companies, with an emphasis on the machine shop. First we show how queueing models can be used to find approximations of the mean and the variance of manufacturing shop lead times. These quantities often serve as a basis to set a fixed planned lead time in an MRP-controlled environment. A major drawback of a fixed planned lead time is the ignorance of the correlation between actual work loads and the lead times that can be realized under a limited capacity flexibility. To overcome this problem, we develop a method that determines the earliest possible completion time of any arriving job, without sacrificing the delivery performance of any other job in the shop. This earliest completion time is then taken to be the delivery date and thereby determines a workload-dependent planned lead time. We compare this capacity planning procedure with a fixed planned lead time approach (as in MRP), with a procedure in which lead times are estimated based on the amount of work. in the shop, and with a workload-oriented release procedure. Numerical experiments so far show an excellent performance of the capacity planning procedure.
引用
收藏
页码:165 / 179
页数:15
相关论文
共 50 条
  • [1] Role of manufacturing lead time in capacity planning
    Pandey, PC
    Hasin, MAA
    [J]. INTERNATIONAL JOURNAL OF MATERIALS & PRODUCT TECHNOLOGY, 1996, 11 (5-6): : 438 - 450
  • [2] Lead time and inventory cost for rough-cut capacity planning
    Pandey, PC
    Hasin, MAA
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 1997, 10 (5-6) : 280 - 288
  • [3] Capacity and lead-time management when demand for service is seasonal and lead-time sensitive
    Thanh-Ha Nguyen
    Wright, Mike
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 247 (02) : 588 - 595
  • [4] Periodic capacity management under a lead-time performance constraint
    Buyukkaramikli, Nasuh C.
    Bertrand, J. Will M.
    van Ooijen, Henny P. G.
    [J]. OR SPECTRUM, 2013, 35 (01) : 221 - 249
  • [5] Periodic capacity management under a lead-time performance constraint
    Nasuh C. Buyukkaramikli
    J. Will M. Bertrand
    Henny P. G. van Ooijen
    [J]. OR Spectrum, 2013, 35 : 221 - 249
  • [6] Inventory and lead time planning with lead-time-sensitive demand
    Yang, Bibo
    Geunes, Joseph
    [J]. IIE TRANSACTIONS, 2007, 39 (05) : 439 - 452
  • [7] LEAD TIME MANAGEMENT
    TATSIOPOULOS, IP
    KINGSMAN, BG
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1983, 14 (04) : 351 - 358
  • [8] LEAD TIME MODELING IN PRODUCTION PLANNING
    Albey, Erinc
    Uzsoy, Reha
    [J]. 2015 WINTER SIMULATION CONFERENCE (WSC), 2015, : 1996 - 2007
  • [9] Robust Capacity Planning for Project Management
    Conejo, Antonio J.
    Hall, Nicholas G.
    Long, Daniel Zhuoyu
    Zhang, Runhao
    [J]. INFORMS JOURNAL ON COMPUTING, 2021, 33 (04) : 1533 - 1550
  • [10] Material and capacity requirements planning with dynamic lead times
    Jodlbauer, Herbert
    Reitner, Sonja
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (16) : 4477 - 4492