MRP SYSTEMS CONSIDERING FUZZY CAPACITY, LEAD TIMES AND INVENTORY AVAILABILITY

被引:6
|
作者
Cano, J. A. [1 ]
Gomez-Montoya, R. A. [2 ]
Cortes, P. [3 ]
Campo, E. A. [4 ]
机构
[1] Univ Medellin, Carrera 87 30-65, Medellin, Colombia
[2] Politecn Colombiano Jaime Isaza Cadavid, Carrera 48 7-151, Medellin, Colombia
[3] Univ Seville, Escuela Tecn Super Ingn, Camino Descubrimientos S-N, Seville 41092, Spain
[4] ESACS Escuela Super Adm Cadena Suministro, Calle 4 18-55, Medellin, Colombia
关键词
MRP; Fuzzy Logic; Lead Time; Inventory; Production Capacity; DEMAND; CONSTRAINTS;
D O I
10.2507/IJSIMM20-1-538
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article aims to propose a fuzzy model for closed-loop material requirement planning (MRP) systems considering uncertain parameters like production capacity, on-hand inventory and lead times. For this, a deterministic closed-loop MRP model is proposed, and then fuzzy coefficients in the constraints of the model are used to establish the fuzzy MRP model, which depends on the degrees of satisfaction (.) of the decision-maker. Data from a production plan of a company dedicated to the manufacture of electrical transformers are employed to verify the proposed fuzzy MRP model, minimizing inventory holding costs, production setup costs, and extra capacity costs. The results show the fuzzy model performs better than the deterministic model, especially for low. values, providing better performance in terms of the total cost, total inventory, service level, and computational efficiency.
引用
收藏
页码:29 / 39
页数:11
相关论文
共 50 条