Calculation Method of the Uncertainty Duration of Construction Projects

被引:0
|
作者
Wang, Fuliang [1 ]
Xu, Xuedong [1 ]
机构
[1] Shandong Agr Univ, Coll Water Conservat & Civil Engn, Tai An, Shandong, Peoples R China
关键词
Construction; Uncertainty; Duration; Probability;
D O I
10.4028/www.scientific.net/AMM.209-211.1411
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The duration of construction project is of great uncertainty because the construction project is of large scale, its construction cycle is long, it takes much consumption in material resources, human and financial resources, it is of complicated cases, and there are also many unpredictable factors. A method to determine the uncertainty duration whose chief path is not a single one is raised combining with engineering practices in this thesis.
引用
收藏
页码:1411 / 1414
页数:4
相关论文
共 50 条
  • [1] Calculation of contingency in construction projects
    Touran, A
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2003, 50 (02) : 135 - 140
  • [2] The calculation of acceleration costs on construction projects
    Maritz, Tinus
    Schutte, Andries
    ACTA STRUCTILIA, 2009, 16 (02) : 86 - 102
  • [3] Determinants of construction duration for building projects in Germany
    Dursun, Onur
    Stoy, Christian
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (04) : 444 - +
  • [4] Construction duration of residential building projects in Germany
    Stoy, Christian
    Dreier, Frank
    Schalcher, Hans-Rudolf
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (01) : 52 - +
  • [6] Robust reliability of projects with activity-duration uncertainty
    Ben-Haim, Y
    Laufer, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (02): : 125 - 132
  • [7] Resilient Scheduling as a Response to Uncertainty in Construction Projects
    Milat, Martina
    Knezic, Snjezana
    Sedlar, Jelena
    APPLIED SCIENCES-BASEL, 2021, 11 (14):
  • [8] A scheduling methodology for dealing with uncertainty in construction projects
    Bruni, Maria Elena
    Beraldi, Patrizia
    Guerriero, Francesca
    Pinto, Erika
    ENGINEERING COMPUTATIONS, 2011, 28 (7-8) : 1064 - 1078
  • [9] Calculation of risk costs in construction projects: Empirical analysis of construction risks applying the Monte Carlo method
    Brokbals, Stefanie
    Wapelhorst, Vincent
    Čadež, Ivan
    Civil Engineering Design, 2019, 1 (3-4) : 120 - 128
  • [10] Modeling scheduling uncertainty in capital construction projects
    Boskers, ND
    AbouRizk, SM
    PROCEEDINGS OF THE 2005 WINTER SIMULATION CONFERENCE, VOLS 1-4, 2005, : 1500 - 1507