Construction duration of residential building projects in Germany

被引:11
|
作者
Stoy, Christian [1 ]
Dreier, Frank [2 ]
Schalcher, Hans-Rudolf [3 ]
机构
[1] Harvard Univ, GSD, Somerville, MA 02145 USA
[2] SMV Bauprojektsteuerung Ingenieurgesell mbH, Berlin, Germany
[3] Swiss Fed Inst Technol, Inst Construct Engn & Management IBB, Zurich, Switzerland
关键词
Construction operations; Residential property; Regression analysis; Germany;
D O I
10.1108/09699980710716972
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Planning the construction duration is an important consideration in any construction project. Indicators that permit an early forecast of the duration provide the basis for such planning. To date, such a basis has been lacking in the German-speaking area. This paper aims to discuss this matter. Design/methodology/approach - Indicators are identified that enable a forecast of the construction duration. In addition, a simple regression model is provided to assist in selecting construction speed indicators. This empirical analysis relies on the data, collected on a uniform basis, from 115 German residential buildings. Findings - Project size (measured in m(2) gross external floor area) and project standard (measured in (sic) building construction cost/m(2) gross external floor area) are found to be significant drivers of construction speed. It appears that project size, in contrast to the project standard, is positively correlated with construction speed. Originality/value - An expansion of the data pool is required for more extensive study. On the one hand, this means including relevant drivers that have only been insufficiently considered to date, such as project complexity, project environment, management-related attributes. On the other hand, the data pool must also be expanded to include other types of use.
引用
收藏
页码:52 / +
页数:14
相关论文
共 50 条
  • [1] Determinants of construction duration for building projects in Germany
    Dursun, Onur
    Stoy, Christian
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (04) : 444 - +
  • [2] CONSTRUCTION DEFECTS IN RESIDENTIAL BUILDING PROJECTS: PILOT STUDY
    Almusharraf, Abdullah
    Whyte, Andrew
    [J]. SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 301 - 306
  • [3] An Exploratory Analysis of Risks in Green Residential Building Construction Projects: The Case of Singapore
    Hwang, Bon-Gang
    Shan, Ming
    Phua, Helena
    Chi, Seokho
    [J]. SUSTAINABILITY, 2017, 9 (07)
  • [4] Assessment of water consumption during production of material and construction phases of residential building projects
    Heravi, Gholamreza
    Abdolvand, Mohammad Mehdi
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2019, 51
  • [5] Activity based risk assessment and safety cost estimation for residential building construction projects
    Gurcanli, G. Emre
    Bilir, Senem
    Sevim, Merve
    [J]. SAFETY SCIENCE, 2015, 80 : 1 - 12
  • [6] A practical tool for estimating compulsory OHS costs of residential building construction projects in Turkey
    Yilmaz, Mustafa
    Kanit, Recep
    [J]. SAFETY SCIENCE, 2018, 101 : 326 - 331
  • [7] Residential building projects: Building cost indicators and drivers
    Stoy, Christian
    Schalcher, Hans-Rudolf
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2007, 133 (02): : 139 - 145
  • [8] Modeling duration of building renovation projects
    Lawal, Haruna Sa'idu
    Ahmadu, Hassan Adaviriku
    Abdullahi, Muhammad
    Yamusa, Muhammad Aliyu
    Abdulrazaq, Mustapha
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2023, 28 (03) : 423 - 438
  • [9] Virtual building for construction projects
    Sheppard, LM
    [J]. IEEE COMPUTER GRAPHICS AND APPLICATIONS, 2004, 24 (01) : 6 - 12
  • [10] Building trust in construction projects
    Khalfan, Malik M. A.
    McDermott, Peter
    Swan, Will
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2007, 12 (06) : 385 - 391