Decentralized Time-Constrained Scheduling for Sensor Network in Identification of Distributed Parameter Systems

被引:1
|
作者
Patan, Maciej [1 ]
Romanek, Adam [1 ]
机构
[1] Univ Zielona Gora, Inst Control & Computat Engn, Ul Podgorna 50, PL-65246 Zielona Gora, Poland
关键词
FAULT-DETECTION; LOCALIZATION; DESIGN;
D O I
10.1007/978-3-319-13881-7_46
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
An efficient approach to determine an activation policy for scanning sensor network monitoring a distributed process over some spatial domain is proposed. The scheduling problem is defined so as to maximize a criterion defined on the Fisher information matrix associated with the estimated parameters. Then, adopting pairwise communication schemes, the multi-exchange procedure is developed, which distributes the configuration process between the network nodes and take account to power consumption constraints. The approach is illustrated through an example on a sensor network scheduling problem for a convective diffusion process.
引用
收藏
页码:415 / 423
页数:9
相关论文
共 50 条
  • [31] Scheduling time-constrained jobs in the presence of background traffic
    Bhulai, S
    Koole, G
    PROCEEDINGS OF THE 39TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-5, 2000, : 1421 - 1426
  • [32] Approximation Algorithms for Time-Constrained Scheduling on Line Networks
    Raecke, Harald
    Rosen, Adi
    SPAA'09: PROCEEDINGS OF THE TWENTY-FIRST ANNUAL SYMPOSIUM ON PARALLELISM IN ALGORITHMS AND ARCHITECTURES, 2009, : 337 - 346
  • [33] Approximation Algorithms for Time-Constrained Scheduling on Line Networks
    Harald Räcke
    Adi Rosén
    Theory of Computing Systems, 2011, 49
  • [35] On optimal scheduling for time-constrained services in multi-channel data dissemination systems
    Chen, Chao-Chun
    Lee, Chiang
    Wang, Shih-Chia
    INFORMATION SYSTEMS, 2009, 34 (01) : 164 - 177
  • [36] A metaheuristic solution approach for the time-constrained project scheduling problem
    Verbeeck, Cedric
    Van Peteghem, Vincent
    Vanhoucke, Mario
    Vansteenwegen, Pieter
    Aghezzaf, El-Houssaine
    OR SPECTRUM, 2017, 39 (02) : 353 - 371
  • [37] A scheduling algorithm for time-constrained model-based diagnosis
    Chantler, M
    Aldea, A
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 1998, 11 (01) : 135 - 148
  • [38] A metaheuristic solution approach for the time-constrained project scheduling problem
    Cédric Verbeeck
    Vincent Van Peteghem
    Mario Vanhoucke
    Pieter Vansteenwegen
    El-Houssaine Aghezzaf
    OR Spectrum, 2017, 39 : 353 - 371
  • [39] Framework for Scheduling and Resource Management in Time-constrained HPC Application
    Portero, Antoni
    Kuchar, Stepan
    Vavrik, Radim
    Golasowski, Martin
    Massari, Giuseppe
    Fornaciari, William
    Vondrak, Vit
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2014 (ICNAAM-2014), 2015, 1648
  • [40] Deciding Model of Population Size in Time-Constrained Task Scheduling
    Sun, Wei
    2009 IEEE INTERNATIONAL SYMPOSIUM ON PARALLEL & DISTRIBUTED PROCESSING, VOLS 1-5, 2009, : 1241 - 1248