A metaheuristic solution approach for the time-constrained project scheduling problem

被引:10
|
作者
Verbeeck, Cedric [1 ]
Van Peteghem, Vincent [2 ]
Vanhoucke, Mario [3 ,4 ]
Vansteenwegen, Pieter [5 ]
Aghezzaf, El-Houssaine [1 ]
机构
[1] Univ Ghent, Dept Ind Management, Technol Pk 903, B-9052 Zwijnaarde, Belgium
[2] EDHEC Business Sch, 24 Ave Gustave Delory, F-59057 Roubaix, France
[3] Univ Ghent, Fac Econ & Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
[4] UCL, Dept Management Sci & Innovat, Gower St, London WC1E 6BT, England
[5] Katholieke Univ Leuven, Leuven Mobil Res Ctr, B-3001 Leuven, Belgium
关键词
Metaheuristics; Project scheduling; Time-constrained; ARTIFICIAL IMMUNE-SYSTEM; PATH-RELINKING; GENETIC ALGORITHM; COST PROBLEM; RESOURCE; HEURISTICS; MODELS;
D O I
10.1007/s00291-016-0458-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Problem is proposed, in which additional resources can be temporarily allocated to meet a given deadline. The problem consists of determining a schedule such that the project is completed on time and that the total additional cost for the resources is minimized. For this problem, an artificial immune system is proposed, in which each solution is represented by a vector of activity start times. A local search procedure, which tries to shift cost causing activities, is applied to each population schedule. Computational experiments are applied to modified resource-constrained project scheduling problem benchmark instances and reveal promising results.
引用
收藏
页码:353 / 371
页数:19
相关论文
共 50 条
  • [1] A metaheuristic solution approach for the time-constrained project scheduling problem
    Cédric Verbeeck
    Vincent Van Peteghem
    Mario Vanhoucke
    Pieter Vansteenwegen
    El-Houssaine Aghezzaf
    [J]. OR Spectrum, 2017, 39 : 353 - 371
  • [2] Time-constrained project scheduling
    Guldemond, T. A.
    Hurink, J. L.
    Paulus, J. J.
    Schutten, J. M. J.
    [J]. JOURNAL OF SCHEDULING, 2008, 11 (02) : 137 - 148
  • [3] Time-constrained project scheduling
    T. A. Guldemond
    J. L. Hurink
    J. J. Paulus
    J. M. J. Schutten
    [J]. Journal of Scheduling, 2008, 11 : 137 - 148
  • [4] Time-constrained project scheduling with adjacent resources
    Hurink, J. L.
    Kok, A. L.
    Paulus, J. J.
    Schutten, J. M. J.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 310 - 319
  • [5] Tropical optimization problems in time-constrained project scheduling
    Krivulin, N.
    [J]. OPTIMIZATION, 2017, 66 (02) : 205 - 224
  • [6] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [7] DELIBERATION SCHEDULING FOR PROBLEM-SOLVING IN TIME-CONSTRAINED ENVIRONMENTS
    BODDY, M
    DEAN, TL
    [J]. ARTIFICIAL INTELLIGENCE, 1994, 67 (02) : 245 - 285
  • [8] A hybrid metaheuristic method for solving resource constrained project scheduling problem
    Shuvo, Ohiduzzaman
    Golder, Swajan
    Islam, Md Rafiqul
    [J]. EVOLUTIONARY INTELLIGENCE, 2023, 16 (02) : 519 - 537
  • [9] A hybrid metaheuristic method for solving resource constrained project scheduling problem
    Ohiduzzaman Shuvo
    Swajan Golder
    Md. Rafiqul Islam
    [J]. Evolutionary Intelligence, 2023, 16 : 519 - 537
  • [10] Complicated Time-Constrained Project Scheduling Problems in Water Conservancy Construction
    Zhang, Song
    Song, Xiaokang
    Shen, Liang
    Xu, Lichun
    [J]. PROCESSES, 2023, 11 (04)